Information was gathered as a follow-up to the public hearing testimony of Liberian immigrants' experience, given to the Truth and Reconciliation Commission in 2008. Interviews were conducted of Liberian people who gave original testimony to the commission to document how they experienced the hearings and what impact the hearings had on those that testified as well as on those that assisted them.
Create a low-cost and advanced LiDAR package to detect wildlife and prevent wildlife collisions with wind turbines, safeguarding bats and birds from fatal accidents.
ASAL Charities will empower Oromo elders and the wider Oromo community to preserve, celebrate, and honor our identity and culture. This proposal would fund both 1) an intergenerational culture-bearing training program and, 2) add a new cultural celebration component to the annual Ireechaa Festival.
Phase 2 of Ducks Unlimited's ongoing engineering program restored and enhanced shallow lakes and wetlands by installing water level control structures to improve aquatic plant abundance and water clarity in partnership with the Minnesota DNR and U.S.
This Phase 9 request for Ducks Unlimited's Living Lakes program will enhance or restore 1,440 acres of wetlands and adjacent prairie grasslands for the U.S. Fish & Wildlife Service and Minnesota DNR on public lands and private lands under permanent easement. DU biologists and engineers will design wetland restorations and water control structures for active management of shallow lake water levels to enhance their ecology for ducks, other wildlife, and people, primarily in SW Minnesota's Prairie Pothole Region.
This Phase 10 request for Ducks Unlimited's Living Lakes program will enhance or restore 1,325 acres of wetlands and adjacent prairie grasslands for the U.S. Fish & Wildlife Service and Minnesota DNR on public lands and private lands under permanent easement. DU biologists and engineers will design wetland restorations and water control structures for active management of shallow lake water levels to enhance their ecology for ducks, other wildlife, and people, primarily in SW Minnesota's Prairie Pothole Region.
Complete eastern Edina portion of the Nine Mile Creek Regional Trail. Construct approximately 4 mile segment of trail from Tracy Avenue near Edina High School to the intersection of Xerxes and 75th on the Edina/Richfield border. Three Rivers has obtained a federal grant for $6.16 million to help pay for this project. The remainder will be funded through Fiscal Year 2014 and 2015 Legacy grants and local funds.
Provide approximately 15 matching grants for local parks, trail, acquisition of natural areas and trails to connect people safety to desirable community locations and regional or state facilities.
The goal of this project is to identify watershed and in-lake best management practices (BMPs) to improve water quality for impaired water bodies within the Upper Long Lake Creek subwatershed. The existing P8 watershed model and BATHTUB lake response models will be updated and refined to identify BMPs, develop project costs, and estimate nutrient load reductions. A feasibility report will be developed that outlines prioritized projects, estimated load reductions, and project costs to accelerate implementation.
The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.
This project will provide surface water quality data to the Minnesota Pollution Control Agency (MPCA) to inform the Watershed Restoration and Protection Strategies (WRAPS) update process. All locations are in the Douglas County portion of the Long Prairie Watershed. Sites have been targeted based on local knowledge and citizen concerns. A culvert inventory will also be completed through this project. This will provide flow path data that will be utilized in future water quality analysis and project designs.
This project will gather watershed data to support the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality for the Long Prairie River Watershed. This project will also provide an important framework for civic and citizen engagement and communication, contributing to long-term public participation in surface water protection and restoration activities throughout the watershed.
This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.
This funding will be used to help fulfill the goals established in the Long Prairie CWMP. Approximate goals addressed are listed with the activities addressing them. Anticipated projects to be implemented include agricultural waste management facilities, agricultural land management, exclusion fencing, rain gardens, subsurface sewage treatment upgrades, shoreline restorations, and forestry. Other projects will be considered as opportunities arise.
Lake Sarah is a regionally significant lake and currently suffers from excess phosphprus levels. Loretto Creek, located partially within the Cities of Medina and Loretto, is Lake Sarah's east tributary carrying approximately 269 pounds of phosphorus to the lake each year. This is a joint project between the Cities of Loretto and Medina developed for the Loretto ballfields to address this problem.