This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.
The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
Phase 2 development of the Hyland Play area--the Park District's most popular play area. A? Phase 2 will consist of expansion of the current play area to add additional play elements which will increase capacity for the site.
The College of Saint Benedict and Saint John's University (CSB+SJU), in partnership with the University of Minnesota Morris (UMM), will collect and analyze archival records and oral testimonies on Native American boarding schools in order to develop educational materials that promote truth and healing. The project includes: 1) archival research; 2) oral testimonies; 3) developing curricular materials from these archival and oral records.
Regional Dance Development Initiative to provide professional development for Minnesota dance makers, to build connections and relationships that will continue to nourish dance artists, and develop the overall capacity and infrastructure of the MN dance community.
Design, engineer, & construct rehabilitation projects associated with existing trails, bridges, habitat enhancement, stormwater management and water quality infrastructure, and signage. Exact project extents and tasks will be refined during project scoping and included in the project's grant agreement.
Design, engineer, & construct rehabilitation projects associated with existing trails, bridges, habitat enhancement, stormwater management and water quality infrastructure, and signage. Exact project extents and tasks will be refined during project scoping and included in the project's grant agreement.
Rehabilitation of Kenilworth Channel within the Minneapolis Chain of Lakes Regional Park to address failing walls and shorelines. Work will include design, engineering, and construction of earthwork, walls, natural habitat restoration, and landscaping.
To hire qualified professionals to repair the North Star Blankets sign on the North Star Woolen Mill, listed in the National Register of Historic Places.
Rehabilitate Minnehaha Regional Park Pavilion to upgrade public spaces including restrooms, open seating areas, plaza spaces, stairs, ramps, and landscaping. Work will include design, engineering, architecture, and construction
In 2008, the Hennepin Medical History Center receivedapproximately 1,700 prints and negatives from the Hennepin County Medical Center's public relations department. Since their transfer, the images have been housed in standard file folders, photo lab envelopes, and banker boxes that rest on the floor of a workroom.
The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.
With this grant, we were able to perform 195 acres of treatment within polygons resulting in the restoration or enhancement of 21 parcels. Overall treatment effort was even greater within wetlands (271 acres), with many areas receiving multiple overlapping treatments. Focusing our treatments on the most ecologically damaged areas allowed us to improve wetlands substantially, even if active treatment did not occur throughout every part of the parcel where invasives may not have occurred. 268+ acres had 50% of their areas treated, which we consider a standard for substantial restoration.
Central Mississippi Riverfront Regional Park, revise master plan to guide future trail development and improvements throughout park including Father Hennepin Bluffs, Nicollet Island, BF Nelson, Boom Island, and Mill Ruins.