Purchase a generator for Well #5 (654758)
Install an arsenic treatment removal system according to MDH rules and regulations.
Seal unused well. Relocate and cover electrical conductor lines around the well.
Survey wells and finalize report. Develop materials and products to educate the public about groundwater protection.
Drill and test for water quality and capacity for a potential new water source.
Spill response planning. PCSI Update. Property owner mailing.
Rehab/Rebuild city well #1.
Test well drill and water quality sample.
Seal well #3.
Seal 2 test wells. Research and document wells, tanks, and leak sites.
Purchase and install a generator for well #2. Phase 1
Assessment of utility ordinances. Completion of a Spill Response Plan. Purchase/install fencing around municipal wells.
Drill new well. Seal well.
Seal wells; Inventory SSTS; Update website
Install two monitoring wells
Update drawdown equipment; Inspect private wells within the DWSMA
Analyze drainage patterns; Stormwater infrastructure mapping throughout the DWSMA
Connect to City of Faribault water system; Abandon existing well
Public education; identify abandoned wells
Seal a well that was improperly sealed
Installation of a 400 amp Transfer Switch
Mail WHP educational materials; Update well inventory
Seal well 1
Signage, test Spring Creek, emergency manual
Public education
Seal well
PCSI wells/tanks and public ed.
Inventory leaking tanks and public education for tank owners
Purchase transducer to be installed on the new municipal well
Seal well; Replace septic system
Seal wells on private property
Drill two test wells (241571 & 221419), install screen and gravel pack, 24 hour pump test for two wells, seal well.
Increase security to protect active production well and water plant that are located out of city limits in rural area.
Seal up to 12 private wells.
Assess security needs and install fence around well and pump house area; Provide brochure about WHP; Mail City DWSMA map
Construct chain link security fence around City wells
Open house National Water Week; Develop presentation about groundwater and purchase sand tank groundwater model; Update City zoning map, emergency plan and City ordinances; update City webpage
Educational materials and webpage update; Install rain gardens and vegetative buffer zones; Purchase haz mat kits