Installation of arsenic water filter system
Construct new well, seal emergency well and create and distribute education material
Wire a generator
Evaluation of wells in well pit, Seal 4 wells within the DWSMA
Update PCSI wells/tanks inventory and public education
Investigate well integrity with camera, measure well casing and disinfection of well.
Install arsenic removal system
Video log well 3 to get exact well and casing depth; Build and display DWSMA map for the city's residents.
Drill test well, grout and chlorination and conduct pump test. Seal a well.
Complete a Feasibility Analysis for CR 75 Trunk Storm Sewer project to eliminate existing infiltration basin within the Emergency Response Zone
Work cooperatively with MDH to select an appropriate well site and perform test drilling and water quality monitoring.
Seal municipal well.
Secure a new water production source.
Purchase a generator for Well #5 (654758)
Install an arsenic treatment removal system according to MDH rules and regulations.
Seal unused well. Relocate and cover electrical conductor lines around the well.
(Phase 2) Remove and replace 2 metal doors at the pumphouse. Install 6' chain link fences with gates around primary and secondary wells.
Survey wells and finalize report. Develop materials and products to educate the public about groundwater protection.
Drill and test for water quality and capacity for a potential new water source.
Connect to rural water system.
Rehab/Rebuild city well #1.
Purchase and install generator.
Test well drill and water quality sample.
Connect to rural water system. (Phase 2)
Seal well #3.
Seal 2 test wells. Research and document wells, tanks, and leak sites.
Purchase and install a generator for well #2. Phase 1
Purchase and installation of a generator.
Provide and install mounted equipment enclosures and submersible level sensors.
Assessment of utility ordinances. Completion of a Spill Response Plan. Purchase/install fencing around municipal wells.
Drill new well. Seal well.
Seal wells; Inventory SSTS; Update website
Install two monitoring wells
Update drawdown equipment; Inspect private wells within the DWSMA
Analyze drainage patterns; Stormwater infrastructure mapping throughout the DWSMA
Connect to City of Faribault water system; Abandon existing well
Public education; identify abandoned wells
Installation of a 400 amp Transfer Switch
Seal well 1