We propose to integrate Minnesota Wildflowers Information, an online tool for plant identification, with the Minnesota Biodiversity Atlas, to preserve and extend this popular ENTRF-supported resource for future use.
This project helps Minnesota entities that directly or indirectly cause PFAS and microplastics contamination stop the flow of the contaminants by developing strategies to manage solid waste streams.
This project is a cooperative initiative between the Prior Lake Spring Lake Watershed District, the City of Prior Lake, and the Scott Soil and Water Conservation District to implement on-the-ground Best Management Practices (BMPs) that will protect and improve water quality in Spring, Upper Prior and Lower Prior Lakes, water resources of local, regional, and state significance. Spring and Upper Prior Lakes are both impaired and have a completed Total Maximum Daily Load and Implementation Plan.
Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.
Prior Lake, the second most visited lake in the metro, and Spring Lake are both impaired for excess nutrients. The Prior Lake Spring Lake FY 2025 request would seek to fund two projects to reduce nutrients in the upper watershed:
Collaboration between African and Asian American artists to jointly create/present a new dance drama - Resonance.
Project Resonance orchestrates new creations of music and dances to serve as a communication bridge across cultural/racial lines, to mitigate racial tensions between African and Asian communities, to illustrate the cross-cultural experience, and eventually promote Intercultural Harmony.
Resonance inspires inner/outer connections to create sustainable impacts.
This project will reduce sediment to the Minnesota River, control erosion and reduce sedimentation in a local DNR Protected Water and protect private land and public infrastructure. The County Road (CR) 6 ravine (Quarry Creek) cuts through the Minnesota River valley bluff in Blakeley Township. Active channel incision and erosion within the ravine has caused large amounts of sediment to be deposited under the bridge at CR 6 such that the road is frequently flooded and sediment has to be removed several times a year.
This project is a documentary film about the intercultural experiences of immigrants living in Minnesota. It features footage of live performances at the Southern Theater, followed by talkbacks with cultural leaders and scholars; and the voices of audience and community members, recorded in post-performance conversations and interviews.
Development of regional trail master plans for the Southern Scott Regional Trail Search Corridor (from Cedar Lake Farm to Cleary Lake Regional Park) and the Louisville Regional Trail Search Corridor including consulting services to prepare the master plans and facilitate a public engagement process.
This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.
This continuation of the Reinvest in Minnesota (RIM) Reserve buffers program will protect and restore riparian areas, permanently protecting approximately 600 acres on 17 easements. This program will continue utilizing a science-based ranking and selection process and be implemented locally, working with Soil and Water Conservation District (SWCD) staff in targeted areas in the state. Historically, buffer funding was used to expand basic water quality buffers into larger buffers.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
This goal of this project is improving water quality and expanding critical wildlife habitat by permanently restoring and enhancing wetlands in the Sand Creek and Prior/Spring Lake Watersheds. By making sign-up payments available through this grant, this project will restore or enhance 400 to 500 acres of wetlands moderating flows and improving water quality. The NRCS has committed $2.5 million through the Wetland Reserve Enhancement Program (WREP), the Scott WMO $314,000, the PLSLWD $145,000, Rice SWCD $40,000, Le Sueur SWCD $40,000, and the Scott SWCD $75,000.
Calcareous fens such as the Savage Fen are fragile ecosystems existing only under a unique combination of soil type, hydrology, chemistry, and vegetation. The City of Savage is continuing efforts to protect this important ecosystem through this project. Two large ravines -Dakota Avenue and McColl's Bluff - discharge to the Fen, which was granted special status under the State's Wetlands Conservation Act. Both ravines are highly eroded and carry a significant amount of stormwater and sediment to the Savage Fen.