This project involves the collaboration between Pan Asian Arts Alliance, Elluminance Era, Chinese American Chamber of Commerce-MN, Asian Media Access, Unity Dance Group, and other Pan Asian Arts groups. It is a first-ever collaboration between Asian American performing and visual arts organizations. The project, "Asia Extravaganza," is a one-night festivity event to showcase Asian American youthful culture through dance, music and storytelling.
The Asian American Short Film Project is a six-month long series of workshops on how to create a five minute narrative or documentary short film culminating in a public event showcasing works-in-progress. This will include workshops on how to write a short film, how to find funding, how to produce a short film with the tools that you already have (i.e. smartphone), how to edit, and how to distribute/show your short film.
We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To improve security of a National Register building by adding eleven cameras to the security system.
Citizens for Backus/AB added eleven cameras to a basic five camera security system, replaced locks and updated the electronic entry of the historic E.W. Backus Jr. High School, now known as the Backus Community Center in International Falls.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.
The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
The purpose of this contract is to expand data collection efforts, public participation efforts, and provide technical assistance in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. A key aspect of this effort is to develop implementation strategies for targeted areas of the watershed to help state agencies, local governments, and other watershed stakeholders determine how to best proceed with restoring and protecting the watershed.
The goals of this project are to develop and implement a stakeholder and public engagement program, update the Hydrological Simulation Program FORTRAN (HSPF) models for the Big Fork and Little Fork River Watersheds, develop Total Maximum Daily Load (TMDL) studies for impaired waterbodies, remove naturally impaired streams from the impairment list, develop a Watershed Restoration and Protection Strategy (WRAPS) report, and to conduct civic engagement activates necessary to ensure project success.
"This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Big Fork River Watershed; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) process and the role citizens and stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for restoration as well projects to accomplish protection of high quality waters; and
The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This project consists of the design of a new marina/dock complex on Birch Lake in Babbitt Minnesota. The City will own and operate the marina/dock complex.
Bois Forte Tribal Leaders have acknowledged the potential loss of our Native Language and unique Ojibwe dialect. With a mere 6 fluent speaker's remaining, it is critical that we utilize creative methods to preserve the language. This project will provide funds to purchase appropriate equipment that will be used to record elders as they tell the history of Bois Forte and teach of the clan system and identify families. The recordings will preserve their knowledge for future generation.
To increase the Ojibwe language fluency, proficiency and literacy fo the Bois Forte Indian Community through partnerships with existing language perservation programs to develop a curriculum for pre-K learners, and K-6th grade.
The Equity Alliance MN will bring to life absent narratives of Latino, Hmong, Native, Asian, African American, and women of the Civil Rights Era in a collaboration among youth, social studies teachers, Full Circle Theater (FCT), and St. Paul Neighborhood Network. The narratives, researched by youth, will be transformed by FCT into a six person play that will be presented, video recorded, and distributed with accompanying curriculum written by social studies teachers for teachers across the Equity Alliance MN and the state.
St. Paul Civic Symphony will help to develop a multidisciplinary arts project for its free 2025 Children's Concert inspired by a recent publication, The Rhythm of Somalia: A Collection of Songs, Stories, and Traditions by Qorsho Hassan, Minnesota Teacher of the Year (2020), and music specialist Becca Buck, both educators at Gideon Pond Elementary, Burnsville.
To provide a space for cultural events and demonstrations at the Northern Minnesota District Fair. By building a performance area and installing a sound system, the fair will have created a dedicated space for history skits, 4-H demonstrations, concerts, and other arts and cultural heritage related programming.
We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
Through the construction of new interactive exhibits and the creation of educational programming, the Duluth Children's Museum will highlight the community and culture of Duluth and the surrounding region. A climbable, playable model of Duluth's iconic canal lighthouses and an educational Ojibwe waaginogaan are among the planned new elements being added to the museum experience.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.
Asian Media Access (AMA) will embark on a capacity-building project aimed at cultivating individual donors from Asian American and Pacific Islanders (AAPIs) and the public, and encompasses a multifaceted approach to enhance grant writing, reporting, nonprofit management, and fundraising capabilities. Key activities include: 1) train and assist board/staff on grant writing and reporting; 2) build internal expertise in grant writing and reporting by obtaining consultation and training from experts in Donor Solicitation.
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
To hire a qualified architect to prepare a conditions assessment and planning documents for the Cathedral of the Immaculate Conception, proposed to be used as a community center, and listed in the National Register of Historic Places.