Drill well to inspect well casing integrity and if casing passes inspection, well to be treated and new hand pump installed. OR Drill well to inspect well casing integrity and the casing fails the inspection. Drill a new well, install new hand pump and se
Installation of an automatic transfer switch and disconnect, wiring, concrete pad, electrical permit, natural gas connection, and other supporting equipment as necessary for a future generator connection.
Hire consultant to provide professional engineering and analysis for site selection options for additional well sites for test wells and future production well.