This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.
This project will provide an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the Pine River watershed. The civic engagement plans will be incorporated into the long term plans for the major watershed project.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
This project will develop and organize a first- stage civic infrastructure pilot in Kanabec County, within the membership of the PICKM (Pine, Isanti, Chisago, Kanabec, and Mille-Lacs) Alliance, and with other organizations in the St. Croix Basin. The work will be grounded in the need for sustainable citizen engagement in water quality management. Civic leaders participating in this project will build their own skills for organizing people and working in partnership with Kanabec County SWCD staff and the St. Croix Basin Team to achieve water quality goals.
This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.
The primary focus of this project is the collection of lake core samples to aid in the completion of lake TMDLs for Dean, Malardi & Fountain lakes. This work will enable completing tasks included in the North Fork Crow River Watershed Restoration & Protection Project (WRPP). Additional data collection is needed to update lake response models. This new data will provide a cohesive and comprehensive data collection for Dean, Malardi and Fountain lakes.
This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.
This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.
We used a programmatic approach to achieve prioritized aquatic habitat protection, restoration, and enhancement for lakes, trout streams, and rivers across all LSOHC planning regions of Minnesota.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.
This proposal will further Cass County's goal of having inspection records for all SSTS systems throughout the county. This project will focus on septic systems in East and West Sylvan Townships. These urbanized townships are located within 2-8 miles of the cities of Brainerd-Baxter and are adjacent to the Crow Wing River near its confluence with the Mississippi River.
The Why Treaties Matter exhibit made possible by previous Legacy funding explores the relationships between Minnesota's Dakota and Ojibwe tribes and the United States Government. The Minnesota Indian Affairs Council and the Humanities Center will take the work and impact of the exhibit deeper by creating a curriculum to complement the exhibit.
To hire a qualified and experienced HVAC engineer to evaluate current system preparatory to better control of the Clearwater County History Museum environment
The Children’s Museum of Southern Minnesota (CMSM) will complete the innovative community engagement process started with the previous Legacy grant. CMSM will build upon the progress created with the previous Legacy grant by transitioning the team's focus to carrying-out of strategic access strategies that engage a diversity of community members in the exhibit development process, resulting in the completion of fabrication plans for exhibits and environments that are accessible; engaging; and reflect the diverse art, culture, and heritage of southern Minnesota.