to construct 3.8 miles of 10 foot wide asphalt multi-use trail connecting Buffalo Hills Park and Kiwanis Park to the Spur Line Trail, the Cuyuna Lakes State Trail and the Paul Bunyan State Trail
Eroding streambanks along Bassett Creek are reducing the water quality of the creek and the Mississippi River. This project consists of stabilizing a 3,100 foot reach of Bassett Creek mostly located within Theodore Wirth Regional Park. The proposed stabilization measures will result in an estimated reduction of 52 tons of sediment and 60 pounds phosphorus per year.
This project contains several activities that will implement effective, shovel ready conservation practices on multiple water bodies. The goal is to reduce the erosion impacting stream bank stability. Three initiatives will be implemented, including the installation of four shoreland restoration/stabilization projects, completion of two stream bank stabilization projects on the Middle Fork Crow River and a rain barrel program. An education program will provide outreach to lake and city residents throughout the Middle Fork Crow River Watershed.
This project will include stream monitoring of six preselected sites from the Leech Lake Watershed (HUC 07010102) and Pine River Watershed (HUC 07010105). The sites will be monitored for chemical, physical and biological parameters for two years.
This project will collect additional water quality and flow data on tributaries on the South Fork Crow River and Buffalo Creek. Further assessment of these reaches will provide a better understanding of what impacts these tributaries have on the impaired South Fork Crow River and Buffalo Creek.
The Children's Discovery Museum in Grand Rapids, Minnesota will increase access and deepen engagement with their effectively proven School Service Program. The museum will take down the economic barriers and increase enrollment. This grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance and art/teaching supplies.
This project will increase awareness about outdoor recreation opportunities at Minnesota state parks and trails among underrepresented groups by creating handicap-accessible, touch-screen kiosks, with information in multiple languages, and placing the kiosks in high-traffic, family-oriented locations.
This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.
This program supports communities as they plan and implement projects that address emerging drinking water supply threats. It supports the exploration cost-effective regional and sub-regional solutions, leverages inter-jurisdictional coordination, and prevents overuse and degradation of groundwater resources.
To produce a one-hour documentary on the history of the laborers who constructed the Minnesota State Capitol, listed in the National Register of Historic Places, based on thorough and completed research.