All Projects

10667 Results for
Recipient
Rice Creek Watershed District and City of Hugo
2012 Fiscal Year Funding Amount
$497,100
Fund Source

Bald Eagle Lake is a popular recreational lake known for its fishery on the Metropolitan Council's Priority Lakes List. The lake is negatively impacted by excess nutrients and restoring its water quality is a local priority.
This project will collect stormwater runoff from an approximately 900 acre area and re-use it to irrigate an existing golf course. This innovative project will provide a multitude of environmental benefits for Bald Eagle Lake including significant runoff volume reduction, groundwater recharge and phosphorus load reduction.

Anoka
Ramsey
Washington
Recipient
Isanti SWCD
2014 Fiscal Year Funding Amount
$120,611
Fund Source

This project is located in an area in the City of Isanti that developed before modern-day stormwater treatment requirements. It will result in the installation of a new stormwater pond in a historic core neighborhood. The urbanized drainage area presently has no other stormwater treatment, except for street sweeping. The new stormwater pond will reduce discharges from a 55 acre site draining to the State Scenic and Recreational Rum River by 12 pounds/yr for phosphorus and approximately 3 tons/yr of sediment.

Isanti
Recipient
Capitol Region WD
2015 Fiscal Year Funding Amount
$200,000
Fund Source

Capitol Region Watershed District will partner with local organizations and private landowners to implement a variety of cost-effective Best Management Practices in the East Kittsondale subwatershed. The urbanized condition of the 1,860 acre subwatershed results in an estimated 1,500 pounds of phosphorus, over 470,000 pounds of sediment, and significant concentrations of bacteria associated with that sediment being sent untreated to the Mississippi River each year. Those pollutants have contributed to several impairments within the river.

Ramsey
Recipient
Regents of the University of Minnesota (Duluth - Kathryn A. Martin Library)
2022 Fiscal Year Funding Amount
$10,000

To hire a consultant to use the OCLC's Total Cost of Stewardship framework to develop a Collection Management and Development Policy.

Aitkin
Carlton
Cook
Itasca
Kanabec
Koochiching
Lake
Pine
St. Louis
Recipient
University of Minnesota-Duluth (NRRI)
2012 Fiscal Year Funding Amount
$148,869
2014 Fiscal Year Funding Amount
$89,828
Fund Source

This project will generate water quality data for 10 stream locations MPCA designated for their 2012 and 2013 open-water sampling seasons (8 by NRRI-UMD and 2 via subcontract to the North St. Louis SWCD). The overall project goal is to collect event-based physical and chemical data sets for 10 agency-prioritized stream sampling sites in NE Minnesota for calculating pollutant loads and for incorporation into the overall State database for MPCA assessment purposes.

Cook
Koochiching
Lake
St. Louis
Recipient
Children's Discovery Museum
2013 Fiscal Year Funding Amount
$22,000

The Children's Discovery Museum's (CDM) new 3,000 piece Wizard of Oz (WOZ) collection will be properly archived, conservation materials purchased, and exhibit concept and design drawings completed. CDM facilitators and educators will travel to other children's museums in Minnesota for staff enrichment and professional development.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Koochiching
Lake of the Woods
Mahnomen
Mille Lacs
Morrison
St. Louis
Todd
Wadena
Recipient
International Institute of Minnesota
2018 Fiscal Year Funding Amount
$2,200
Ramsey
Recipient
City of St. Paul
2013 Fiscal Year Funding Amount
$6,600
To hire a qualified professional to complete a structural assessment and work plan.
Ramsey
Recipient
Name of minor withheld due to MN Statutes 2018, section 3.303.10
2014 Fiscal Year Funding Amount
$850
Student Artist Mentorship
Wadena
Recipient
Board of Water and Soil Resources
2010 Fiscal Year Funding Amount
$1,600,000
Fund Source

Grants to counties to implement SSTS programs including inventories, enforcement, development of databases, and systems to insure SSTS maintenance and of reporting program results to BWSR and MPCA and base grants.

Benton
Blue Earth
Carver
Cass
Chisago
Douglas
Faribault
Goodhue
Houston
Morrison
Rice
Wadena
Wright
Recipient
Maritime Heritage Minnesota
2019 Fiscal Year Funding Amount
$9,980
Hennepin
Ramsey
Scott
Wright
Recipient
Ramsey Conservation District
2017 Fiscal Year Funding Amount
$60,500
Fund Source

The Ramsey Conservation District is partnering with the Vadnais Lake Area Water Management Organization, St. Paul Regional Water Service, and Ramsey County Parks and Recreation to restore and stabilize approximately 550 linear feet of streambank along the Sucker Lake Channel in northeastern Ramsey County with a cost effective critical area planting, replacing the existing mix of turf grass and asphalt streambank with a native vegetation planting.

Ramsey
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$52,137
2011 Fiscal Year Funding Amount
$199,755
Fund Source

The Sunrise Watershed is a high priority subwatershed of the St. Croix River. Chisago County, the United States Army Corps of Engineers (ACOE), the MPCA and several additional cooperators will complete a study of the Sunrise River Watershed. The goal of the study is to develop a watershed-based plan and strategies for water quality and aquatic ecosystem management, restoration and protection. Once completed, the study will provide input to the development of the TMDL and Watershed Restoration and Protection Plan for the Sunrise Watershed.

Chisago
Recipient
Anoka CD
2023 Fiscal Year Funding Amount
$78,500
Fund Source

This project will achieve pollutant reductions within a chain of lakes with a hard-won trend of improving water quality. We will install shoreline stabilization projects with near-shore native plant buffers and in-lake aquatic plantings. We will stabilize at least 300 linear feet of shoreline resulting in at least 4 lbs/yr of phosphorus and 2.4 tons/yr of sediment reduction. This project is small budget and modest scale, but a critical finish-line kick to reach goals after many other larger projects that have nearly achieved goals.

Anoka
Recipient
Comfort Lake-Forest Lake WD
2020 Fiscal Year Funding Amount
$492,000
Fund Source
Chisago
Recipient
Anoka CD
2020 Fiscal Year Funding Amount
$148,000
Fund Source
Anoka
Isanti
Recipient
Science Museum of Minnesota-St. Croix Watershed Research Station
2011 Fiscal Year Funding Amount
$50,000
Fund Source

This project will apply the Sunrise River watershed computer model generated under previous projects to selected scenarios of land-cover and land-management changes. The watershed model calibrated to conditions in the late 1990s will form the initial baseline against which all other model runs will be contrasted. Scenarios to be run will include changes in future land cover, agricultural practices, urban practices, and natural resource management.

Washington
Isanti
Chisago
Anoka
Recipient
Anoka CD
2024 Fiscal Year Funding Amount
$107,000
Fund Source
Anoka
Recipient
Ramsey County
2016 Fiscal Year Funding Amount
$25,000
Fund Source

Supplement Way finding implementation costs for cross-country ski trails at Battle Creek Regional Park, Tamarack Nature Center, and Grass-Vadnais-Snail Lakes Regional Park. *( 2013 winter visits; Bald Eagle Otter Lake, 21,800 visits; Battle Creek Regional Park, 62,600 visits; and Grass Vadnais Snail Lakes Regional Park, 62,100 visits).

Ramsey
Recipient
Dovetail Partners, Inc.
2012 Fiscal Year Funding Amount
$75,000
2013 Fiscal Year Funding Amount
$75,000

PROJECT OVERVIEW

Cook
St. Louis
Recipient
Vadnais Lake Area Water Management Organization
2017 Fiscal Year Funding Amount
$500,000
Ramsey
Recipient
Cedar Creek Ecosystem Science Reserve
2011 Fiscal Year Funding Amount
$221,000


PROJECT OVERVIEW

Anoka
Isanti
Recipient
Scott Soil & Water Conservation District
2011 Fiscal Year Funding Amount
$53,745
Fund Source

This project will assess the condition of ten tributary streams in the Blakeley Bluff region of Scott County. The selected tributaries all discharge directly into the the Minnesota River, which is impaired for fecal coliform and turbidity.

Scott
Recipient
Cannon River Watershed Partnership
2010 Fiscal Year Funding Amount
$69,471
Fund Source

This project will assess lakes and streams in the Cannon River watershed that have not been assessed to determine if they are meeting their designated uses. Some of these lakes and streams have data for certain pollutants, but not enough to complete an impairment assessment. The river and stream reaches are located in Dakota, Goodhue, Le Sueur, Rice, Steele, and Waseca counties. The lakes are located throughout the Cannon watershed (Le Sueur, Rice and Waseca Counties). This project will be a continuation of past assessments conducted in 2007 and 2009.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
St. Louis River Citizen Action Committee
2010 Fiscal Year Funding Amount
$48,685
Fund Source

The St. Louis River Alliance will complete the data set for the water quality assessment of six target streams in the Lake Superior Basin. These streams are the Gooseberry River, Beaver River, Lester River, Big Sucker River, Split Rock River and Knife River. In addition, the St. Louis River Alliance will complete the data set for the water quality assessment of two non-target streams in the St. Louis River watershed. These two streams are Coffee Creek and Buckingham Creek. The St.

Aitkin
Carlton
Cook
Lake
St. Louis
Recipient
Becker County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$19,176
Fund Source

This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.

Becker
Cass
Clay
Clearwater
Crow Wing
Hubbard
Mahnomen
Morrison
Norman
Otter Tail
Polk
Todd
Wadena
Recipient
Cook County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$22,139
Fund Source

This project will collect a complete data set for total phosphorous and chlorophyll-a for 6 Cook County lakes while fostering lake association participation, ownership and understanding of their lakes. While many Cook County lakes have participated in the Citizen Lake Monitoring Program (CLMP) taking Secchi disk readings, these same lakes are deficient in basic lake chemistry data such as total phosphorus and chlorophyll-a.

Cook
Recipient
Hubbard County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$11,509
Fund Source

This project will collect water quality data for 13 Hubbard County lakes located in the Crow Wing priority watershed and identified as priority lakes by the MPCA. Upon completion the project data set will include all of the necessary information for the lakes to be assessed for impairment due to nutrients. Volunteers will collect samples from 7 of the 13 lakes and paid SWCD staff will collect samples from 6 of the lakes that do not have public access or volunteers willing to sample. The water samples will be collected 5 times/year June-September in 2010 and 2011.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Douglas Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$16,892
Fund Source

This project will obtain a lake data set for Douglas County while fostering lake association participation, ownership, and understanding of their lakes. A better understanding of these lakes is necessary in order to meet goals established in the 2009-2019 Comprehensive Local Water Management Plan and enable 303(d) and 305(b) assessments. Lakes included in this project are: Agnes, Alvin, Blackwell, Brophy, Charley, Cook (Cork), Crooked (East), Crooked (NW), Echo, Henry, Lovera (Lovers), Mina, Round, and Spring.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Rice County Planning and Zoning
2010 Fiscal Year Funding Amount
$25,308
Fund Source

Rice County Water Resources Division will complete a Surface Water Assessment for six lakes located in the Cannon River Watershed. The lakes chosen include: Sprague Lake (66-0045-00), Mud Lake (66-0054-00), Hatch Lake (66-0063-00), Pooles Lake (66-0046-00), Logue Lake (66-0057-00), and Phelps Lake (66-0062-00). Each lake chosen is currently unassessed, and both Sprague and Mud lake are priority lakes for testing. Sampling will include testing dissolved oxygen, temperature, pH, Secchi, Total phosphorus, and chlorophyll-a. The samples will be taken by volunteers and paid staff.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Chisago County Environmental Services
2019 Fiscal Year Funding Amount
$2,254,000

Swedish Immigrant Regional Trail connection through Interstate Park to Taylors Falls City Hall. Build 180 bridge and trail segment A&B as illustrated. Segment C reviews and engineering only.

Chisago
Recipient
Our Saviour's Lutheran Church
2021 Fiscal Year Funding Amount
$10,000
Anoka
Recipient
Our Saviour's Lutheran Church
2023 Fiscal Year Funding Amount
$16,500

To hire qualified professionals to produce drawings for restoration of the Swedish Evangelical Lutheran Church, listed in the National Register of Historic Places.

Anoka
Recipient
Isanti County Historical Society
2011 Fiscal Year Funding Amount
$6,500

Preservation professionals were commissioned to prepare a condition asssessment report to determine the scope and types of repairs needed to preserve the Swedish Mission Church, listed in the Natioanl Register of Historic Places. The report provides information for future restoration and potential usage for the historical building.

Isanti
Recipient
Todd Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$8,673
Fund Source

This project will be a joint effort between the Todd Soil & Water Conservation District (SWCD) and the Sylvan Shores residents. Todd SWCD will organize and coordinate the project in full partnership with the Sylvan Shores residents. The actual monitoring will be a cooperative effort between Todd SWCD staff and citizen volunteers at Fawn and Pine Island Lakes.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Ramsey County
2010 Fiscal Year Funding Amount
$75,000
Fund Source

to design and install solar PV power equipment at the Garden Center adjacent to the children's garden for interpretive experiences

Ramsey
Recipient
Cook County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$126,125
Fund Source

Increased development pressure on shorelines and lakes with declining water quality is a concern in Cook County. To work towards reducing nutrient loading in lakes, the county has systematically prioritized lakeshore properties for SSTS inspections. The next three highly developed lakes identified for inspection are within the Lake Superior North Watershed. Monitoring has provided evidence of declining water quality in these lakes.

Cook
Recipient
Ramsey-Washington Metro Watershed District
2013 Fiscal Year Funding Amount
$150,000
Fund Source

Ramsey-Washington Metro Watershed District (RWMWD) is a largely developed area of the Twin Cities with an average impervious surface area of 34%. Faith organizations often have large impervious surface areas with little to no stormwater treatment on site. The goal of this project is to collaborate with faith organizations in high priority areas to implement stormwater volume reduction retrofit projects. High priority areas are defined as areas with limited to no stormwater treatment before reaching a water body and/or areas that drain to an impaired water.

Ramsey
Washington
Recipient
Anoka CD
2018 Fiscal Year Funding Amount
$236,000
Fund Source
Anoka
Recipient
Pomme de Terre River Association JPB
2019 Fiscal Year Funding Amount
$541,776
Fund Source

With the proposed project, the Pomme de Terre River Association will target catchments delivering the highest 25% of sediment from agricultural land and identified priority management zones for storm water runoff (identified in the Watershed Restoration and Protection Strategy). Implementation is estimate to reduce sediment runoff to prioritized water bodies by 14,690 tons per year and phosphorous by 12,270 pounds per year.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift