To strengthen a large partnership, including American Indian partners, as they improve and make available more historic information about the Minnesota River Valley.
To contract with qualified professionals to prepare construction documents for the preservation of State Bank of Clements, listed in the National Register of Historic Places.
To hire a qualified specialist to conduct a conditions assessment of the Oberholtzer Estate's historic stonework on Mallard Island, listed in the National Register of Historic Places.
Our new project, Honor the Past, Preserve the Future: Hmong 18 Clans Custom and Cultural Preservation Project, is to preserve the history, traditional, and changing lives of the Hmong Minnesotans.
The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.
This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
This project will enhance the current program, integrating new invasive carp control and detection methods to monitor and remove invasive carp to avoid establishment in Minnesota.
Minnesota has 15.9 million acres of forest land managed by a variety of county, state and federal agencies, and private landowners for timber production, wildlife habitat, and ecological considerations. Forest managers rely on inventory data to make effective planning and management decisions. Because forests are continually changing through natural and human processes, forest inventory data is periodically updated. However, doing so is an expensive and time-consuming endeavor and, as a result, much of Minnesota’s forest inventory data is currently out of date.
We will compile all available data for Minnesota Trumpeter Swans and use these sources to model historical population abundance and predict future population dynamics.
The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models simulate sediment erosion and transport, however these models periodically need to be adjusted to be consistent with the most recent sources of information regarding sediment distribution and loading rates. The goal of this project is to refine the sediment source partitioning and simulation in the Minnesota River basin using all relevant available sources of information.
The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.
Maintenance of the Ojibwe language and culture classes, along withi participatioin in Ojibwe Quiz bowls, classroom presentations, language tables and Ojibwe cultural immersion camp, are essential for continued success of American Indian students and ensures a positive reinforcement of the self-image of American Indian students. The Dakota and Ojibwe Language Revitalization Grant will be monitored by the ISD 361 Indian Education staff and parent committee. Quarterly meetins will take place to monitor the program.
Woody biomass energy systems have shown themselves to offer more locally-based, stable energy supplies for some communities. Itasca Community College is using this appropriation to design a renewable energy system based on woody biomass that will serve as a demonstration and educational tool in the region.
Itasca SWCD will work with the Minnesota Pollution Control Agency as a collaborative effort to monitor the Big Fork River near Bigfork at State Highway 6 and Big Fork River near Craigsville at State Highway 6. Itasca Soil and Water Conservation District (SWCD) staff will strive to capture the peak, rising, and falling limbs of the hydrograph for spring run-off and significant storm events as well as base flow samples. Itasca SWCD staff will utilize local rain gauge readers, storm tracking weather services, and historical stage data to aid in making monitoring judgments.
The Kairos Alive! Cultural Wisdom Immersion and Sharing Project collaborates with Centro Tyrone Guzman, Augustana Open Circle, Walker West Music Academy and outstate Developmental Achievement Centers to explore and exchange joyful cultural meaning through music, dance, song and story via 2-way Zoom webcast. Project explores cultural heritage and identity expression, and how it relates to the universality of human experience, in an environment of creative safety and intercultural exchange.
This project collaborates with 1) Minneapolis Hawthorne Neighborhood Council (multi-cultural/intergenerational); 2) Minnesota Independence College and Community (MICC), Richfield (neuro-divergent young adults); 3) an established network of 20+ senior centers and organizations serving people with developmental disabilities statewide (multi-cultural and intergenerational), such as Centro Tyrone Guzman (Latinx), Ecumen Prairie Lodge, Brooklyn Park, Wabasha County Developmental Achievement Center, Wabasha, and Adult Day Services, Bemidji; 4) community collaborations in Bemidji and New Ulm servi
After completing the One Watershed One Plan planning process for the Kettle & Upper St. Croix Watershed, and having the Kettle & Upper St. Croix Comprehensive Watershed Management Plan (KUSC CWMP) approved by BWSR, the local partners of the watershed will use the implementation funds to complete the actions in the plan. These actions will help complete the 10-year goals that are laid out in the plan. This in turn will help protect and restore water and soil resources in the Kettle & Upper St. Croix watersheds.
To provide a variety of arts and cultural heritage activities at the Koochiching County Fair. Funds will be used to bring The Community of a Plate Exhibit to the fair. A Grand Rapids photographer will be commissioned to photograph local food producers in Koochiching County. Their portraits will be displayed during the fair.
To enhance the existing performance stage, install six “farm museum” murals produced by a local high school, and offer several programs promoting northern Minnesota’s agricultural heritage. Koochiching County Fair has updated their performance stage to have the capacity to offer several arts performances including a barbershop quartet, a robotic puppet show, a dogsled demonstration, and an antique machinery display. In addition to offering performance art shows, the fair has installed several murals created by local children celebrating the areas local agricultural history.
The goal of this project is to develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the Big Fork and Littlefork River Watersheds.
The Big Fork River Watershed Assessment will include the waters of the Big Fork, Sturgeon River, Caldwell Brook, Bear River, and Bowstring River. This Assessment will also include Mirror Lake, Battle Lake, Bass Lake, Larson Lake, Gunn Lake, Coon Sandwick Lake, Busties Lake, Dead Horse Lake, North Star Lake, Burns Lake, Big Ole Lake, Big Island Lake, Bello Lake, Maple Lake, Long Lake, Jessie Lake, Trestle Lake, Clear Lake, Dora Lake, Moose Lake, Shallow Pond Lake, and Island Lake.
The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.
Contractor will address MPCA comments to the pre-public notice draft Total Maximum Daily Load (TMDL) study for the Lake of the Woods watershed and produce a revised study ready for public notice. RESPEC will also prepare for and participate in two webinar-style public meetings once the study is on public notice.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
This project will provide monitoring of four of the major watersheds (8-digit Hydrologic Unit Codes) in the western part of the Rainy River Basin. Staff from the Lake of the Woods SWCD will conduct water quality sampling, review, manage and provide collected data to the Minnesota Pollution Control Agency (MPCA).