This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.
The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.
This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
The VLAWMO watershed covers approximately 25 square miles in the northeast metropolitan area in northern Ramsey County and a small portion of Anoka County, Minnesota. It encompasses the City of North Oaks and portions of the Cities of White Bear Lake, Gem Lake, Vadnais Heights, Lino Lakes, and White Bear Township. This project will gather and organize existing data, support the continuation of modeling and TMDL allocations along with an additional stakeholder meeting. It will also provide the completion of a draft and final TMDL report.
This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.
Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.
Cypher Side will organize a range of urban dance programming/activities, including:
- A Hmong Arts Day that provides a platform for Hmong artists of various artistic disciplines to display their talents.
- A dance showcases and one community performance by individuals who are learning to dance (e.g. at a fair);
- A public, cypher-style dance battle for dancers or all ages and abilities; and
- Three master class workshops for dance instructors or skilled dancers who are looking to hone their craft.
An interactive planetarium program was developed to create a culturally relevant tour of the cosmos from the local/regional perspective of the Dakota/Lakota communities of Minnesota and South Dakota. The program blends Dakota/Lakota star knowledge with Earth and Space Science data. It is delivered live, using real-time imagery projected on the Minnesota Planetarium Society's ExploraDome. The program can be simultaneously "dome-casted" to other participating locations through the Internet using the planetarium navigator.
Bruce Vento Regional Trail. Design development plans for trail development and connection, storm water management improvements and site amenities on trail from Buerkle Road to Hwy 96.
Bald Eagle Otter Lakes Regional Park. Design and construct an early learning center at Tamarack Nature Center, and pedestrian connections, landscape restoration, signage, and other site amenities.
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Grass Vadnais Lakes Regional Park, design and construct trail on east side of Vadnais Lakes, new bituminous trail and parallel turf trail; site and restoration improvements; improve storm water management; and site amenities.
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Phase 1 Design/Development Trailhead Rice Ck No RT, bituminous and natural surface trails, trailhead building with restrooms, entrance road and parking lot development, cross country ski staging area and trails, signage, storm water management, habitat restoration, landscaping.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Design and construct an early learning center at Tamarack Nature Center, and pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle Otter Lakes Regional Park.