Install automatic Transfer Switch, generator wiring, electrical permit, commissioning, all wiring, gas connection equipment and other supporting equipment for future generator connection.
This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.
Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.
This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.
The City of Mankato is looking to restore a varied ecosystem that includes wetland restoration, upland prairie establishment, and stream improvements. A minimum of a 100 acre area would provide habitat that supports a diverse mix of plants and animals and will allow for different types of outdoor sporting opportunities. The project is a unique opportunity for habitat establishment and protection in an urbanizing area that will provide lasting benefits for region.
Lakes and streams located in Blue Earth, Le Sueur, and Waseca Counties provide important public benefits such as hydrologic storage, economic and recreational opportunities, and regional water quality improvement. However, several of the lakes and streams have been listed as impaired because of excess nutrients and sediment from runoff.
Successful long-term treatment of sewage depends on a system capable of providing adequate treatment and effective on-going operation and maintenance. Clean Water Fund Subsurface Sewage Treatment System (SSTS) Program Enhancement funds are used by counties to strengthen programs dedicated to SSTS ordinance management and enforcement. These funds are used for a variety of tasks required to successfully implement a local SSTS program including inventories, enforcement, and databases to insure SSTS maintenance reporting programs.
This project contains several activities that will implement effective, shovel ready conservation practices on multiple water bodies. The goal is to reduce the erosion impacting stream bank stability. Three initiatives will be implemented, including the installation of four shoreland restoration/stabilization projects, completion of two stream bank stabilization projects on the Middle Fork Crow River and a rain barrel program. An education program will provide outreach to lake and city residents throughout the Middle Fork Crow River Watershed.
Minnesota’s extensive state park and trail system, the second oldest in the country, is currently comprised of a total of 76 state parks and recreation areas and 13 state trails scattered throughout the state. Some of Minnesota’s state parks and trails have privately owned lands within the designated park boundaries or trail corridors. Purchase of these lands from willing landowners for addition to the state park and trail system makes them permanently available for public recreation and enjoyment and facilitates more efficient management.
Each fiscal year of ACHF funding, a majority of the twelve regional library systems agree to allocate 10% of their ACHF funding to support statewide partnership projects. SELCO serves as the fiscal agent for statewide projects.
We will deploy acoustic detectors and revisit roost trees identified in our previous ENRTF project to measure effect of seven years of white-nose syndrome on Minnesota bats.
This grant seeks to build the top 5 prioritized projects (2 iron-enhanced sand filters, 1 rain garden, 1 infiltration trench, and 1 tree trench) within the City of New London. Installation of these project will result in a cost-effective pollutant reduction from city runoff to various nearby water resources. The project is estimated to reduce sediment by 2 tons and phosphorus by 8 pounds annually.
This project seeks to provide data on insecticide contamination in the soil and the insect community across the state and the effect of sublethal insecticide exposure on insect reproduction.
Grants to counties to implement SSTS programs including inventories, enforcement, development of databases, and systems to insure SSTS maintenance and of reporting program results to BWSR and MPCA and base grants.
The project will work with county and Waseca Soil and Water Conservation District staff to increase knowledge and participation in the Watershed Approach efforts and provide input to the Watershed Restoration and Protection Strategies (WRAPS) document.
The Le Sueur Watershed Technician will provide highly focused targeting of conservation programs and practices in this key watershed. The technician will enhance current staff capabilities in the Le Sueur watershed by collecting landowner contact information, producing landowner mailings about funding opportunities, and meeting one-on-one with landowners to discuss conservation concerns they may have. This has been a highly successful method for targeting projects, project identification, landowner contact, and project follow through.
This project will complete a Acetochlor Impairment Response Report. This report will combine and coordinate information relating to actions being done in direct response to the acetochlor water quality impairments with those being done and support MDA’s on-going responsibility to assure pesticides are used in a manner that does not cause unreasonable adverse effects on the environment.