Install a Well House security system to current scada system.
Install variable frequency drive on well 2 to control pump rate and pressure in water system.
Nutrient Management Stategies to reduce nitrate reaching the aquifer, public education and well sealing.
Create, Publish, and Mail article; Install software
Purchase storage unit and equipment to secure a possible spill site.
Consultant to develop specific performance standards and conditions to be used in the DWSMA. Wellhouse security upgrades.
Sponsor MSW Festival. Educate community on SWP, WHP and water conservation.
Seal up to 3 unused wells.
Locate, drill and connect new well.
Pull pump and seal 12" X 158' deep well at creamery (220425) with Portland cement and grout
Drill new well
Well and wellhouse improvement and repair.
Install generator, conduit, wire materials, and controls. Install security cameras and recorder in water treatment plant.
Seal old water well adjacent to Power Plant. Purchase of 3 spill contaminant kits.
Purchase GPS technology. Purchase nitrate testing equipment.
Locate well and seal if found. Video log well #2.
Seal a unused community well just outside the DWSMA.
Seal a 6" -140' deep well.
Replace a shallow driven well (Sandpoint) well with a drilled well.
Drill test well
Seal abandoned irrigation well. Prepare a wellhead newsletter.
Implement St Cloud Storm Drain Art program. Implement second year of the Adopt-a-Drain program.
Well construction. Well Sealing.
Install new well.
Assess the condition of the SSTS and provide necessary maintenance.
Purchase televising equipment
Seal unused city well #3.