To strengthen a large partnership, including American Indian partners, as they improve and make available more historic information about the Minnesota River Valley.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
With only 1% of Minnesota’s native prairie remaining, many prairie plant and animal species have dramatically declined. Of the 12 butterfly species native to Minnesota prairies, two species, the Poweshiek skipperling and the Dakota skipper, have already largely disappeared from the state and are proposed for listing under the U.S. Endangered Species Act despite being historically among the most common prairie butterflies and having their historic ranges concentrated in Minnesota.
With only 1% of Minnesota’s native prairie remaining, many prairie plant and animal species have dramatically declined. Of the 12 butterfly species native to Minnesota prairies, two species, the Poweshiek skipperling and the Dakota skipper, have already largely disappeared from the state and are proposed for listing under the U.S. Endangered Species Act despite being historically among the most common prairie butterflies and having their historic ranges concentrated in Minnesota.
This project will enhance the current program, integrating new invasive carp control and detection methods to monitor and remove invasive carp to avoid establishment in Minnesota.
Enhance knowledge of Minnesota's native aquatic plant biodiversity, the backbone of healthy aquatic systems, by delivering data products that support conservation, protection and management for decision-makers and scientists.
Autonomous robots, powered by green hydrogen and solar power, designed to remove weeds in row crop fields can improve agricultural ecosystems with reduced herbicide application and fossil fuel use.
We will compile all available data for Minnesota Trumpeter Swans and use these sources to model historical population abundance and predict future population dynamics.
The Middle Fork Crow River Watershed District will conduct a river assessment to determine the scope of eroding riverbanks and a stormwater modeling project to identify targeted locations for stormwater management. The river assessment will: 1) verify that streambank erosion is the major contributor of pollutants, including sediment, Phosphorus, and Nitrogen; 2) catalog and quantify the erosion, and; 3) provide an assessment of reductions that could be achieved using specific solutions.
The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.
Funds for RIM conservation easements build on Clean Water Fund (CWF) investments for restoration and protection projects that "stack" habitat and clean water benefits. Projects will be identified in watershed plans developed through BWSR's One Watershed, One Plan program, in which local governments strategically set priorities for clean water and habitat, target implementation, and set measurable goals. BWSR currently distributes CWF dollars to partnerships with approved plans for water quality projects.
The Greater Litchfield Opera House Association contracted with an experienced historical architect to design and create a work plan to properly guide interior restoration and preserve remaining historic fabric of the Litchfield Opera House, listed in the National Register of Historic Places. A set of interior planning documents were developed for a final report. It will be used for future restoration work.
"The restoration of the Litchfield Opera House is a communityy project involving hundreds of people of all ages, talents and beliefs."
MCHS accomplished more than the stated goal to finish the inventory of the remaining half of an estimated 8000+ items. A total of 17,000 items were inventoried. The MCHS now has a more accurate and complete resource for access and control of the collections.
Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.
The Kairos Alive! Cultural Wisdom Immersion and Sharing Project collaborates with Centro Tyrone Guzman, Augustana Open Circle, Walker West Music Academy and outstate Developmental Achievement Centers to explore and exchange joyful cultural meaning through music, dance, song and story via 2-way Zoom webcast. Project explores cultural heritage and identity expression, and how it relates to the universality of human experience, in an environment of creative safety and intercultural exchange.
The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
To create restrooms that meet Americans with Disabilities Act requirements in the Litchfield Opera House, listed in the National Register of Historic Places
To hire a qualified and experienced HVAC engineer to evaluate current system preparatory to better control of the Litchfield Opera House, which is listed in the National Register of Historic Places.
To complete stabilization and rehabilitation of the exterior envelope of the Litchfield Opera House, listed in the National Register of Historic Places, and used as a community space.