Funding through this appropriation enhanced 8,359 acres of wetland habitat. Included in this work were six infrastructure projects that enhanced 871 acres and a Douglas County wetland restoration was done in cooperation with Pheasants Forever. Wetland management actions by the Region 1 Roving Habitat Crew enhanced almost 7,500 wetland acres through work on prescribed burns, herbicide applications, and removal of woody vegetation. Survey and design work in Rice County gathered information for possible future construction.
This is Phase 13 Ducks Unlimited's of prairie wetland acquisition and restoration program in Minnesota. DU proposes to acquire and restore land containing wetlands and drained wetlands, and land bordering shallow lakes in Minnesota's Prairie Pothole Region for inclusion in MNDNR state WMAs and USFWS federal WPAs/NWRs. This ongoing land acquisition/restoration program focuses on restoring cropland with drained wetlands near existing WMAs and WPAs/NWRs to help restore prairie wetland habitat complexes for breeding ducks, other wildlife, and people.
Funding through this appropriation enhanced 4,745 acres of wetland habitat. Four wetland/shallow lake infrastructure projects were competed that enhanced 1,020 acres and and another project restored 50 acres. Wetland management actions (wild rice seeding, a significant drawdown, and a major large prescribed burn) enhanced 1,997 acres. Work by the Region 3 Roving Habitat Crew enhanced 1,678 wetland acres through work on prescribed burns, drawdowns, herbicide applications, and removal of woody vegetation.
This Phase 11 request supports Ducks Unlimited's prairie land acquisition and restoration program. DU proposes to acquire and restore 550 acres of land containing drained wetlands and land on shallow lakes in SW Minnesota's Prairie Pothole Region for transfer into the Minnesota DNR's state WMA system. This land acquisition and restoration program focuses on restoring cropland with drained wetlands along shallow lakes and adjoining WMAs to help restore prairie wetland habitat complexes for breeding ducks and other wildlife.
State leadership for the 4-H Shooting Sports & Wildlife Program, including staff and 4-H volunteer committee members, will provide a menu of equipment options for local programs to choose from as a means to build their Shooting Sports & Wildlife project. Local programs will submit a grant application justifying how the new equipment will help them build and grow their program, attract and engage new audiences, and provide sustainability in their local chapter.
To construct an Arts and Heritage Center on the fair grounds. The Sibley County Fair will erect an Arts and Heritage Center with a 40 foot stage and two dressing rooms. The building will primarily serve as an educational arts and culture center for the fair. The fair will present acts on the stage from six to eight hours per day during the fair.
To rehabilitate the original horse racing judges’ stand. The stand is the last relic of the 143 year old fair grounds and dates back to the late 1800’s. The stand is comprised of a first story entry and refreshment area, and an upper section for judging the races. It’s 360 degree observation of the track was made possible by its hexagon shape and large doors that could be lifted when needed on each side. This is the first stage of the multi-year restoration of this prized building and is an important part of the plan to initiate a daily educational program at the fair.
The proposed project area covers roughly one hundred square miles within Sibley County, but also includes a small portion of Nicollet County where Judicial Ditch 1A runs into the south branch of the Rush River. One lake and seven streams are part of the proposed project monitoring sites. Of the seven stream locations, two are part of the High Island Creek Watershed, while the remaining five are part of the Rush River Watershed. The lone lake, Lake Washington, falls within the Bevens Creek Watershed.
This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.
The Brown County Museum has been located in the former New Ulm Post Office building since 1985.The historic building in New Ulm, Minnesota, United States was built in 1909 and was placed on the National Register of Historic P
Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.
This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.
The South Fork Crow River Comprehensive Watershed Management Plan (SFCR CMWP) identifies priority concerns, short-term and long-term goals for drainage water management, loss of water storage and altered hydrology, nutrient loading to surface waters, wind and water erosion, and soil health. Through the plan, specific details for structural and management practices are described in the implementation schedule for each of the planning regions and priority areas.
The goal of the project is to sustain the existing Volunteer Nitrate Monitoring Network (VNMN) domestic well network for long-term groundwater quality studies by generating ambient groundwater quality data in domestic drinking water wells completed in various southeastern Minnesota aquifers, contrasting vulnerable and non-vulnerable hydrogeologic settings.
Each fiscal year of ACHF funding, a majority of the twelve regional library systems agree to allocate 10% of their ACHF funding to support statewide partnership projects. SELCO serves as the fiscal agent for statewide projects.
We will deploy acoustic detectors and revisit roost trees identified in our previous ENRTF project to measure effect of seven years of white-nose syndrome on Minnesota bats.