Seal wells on private property; Educate businesses about proper tank management; Provide DWSMA map to MPCA tank units; Above ground storage tanks - updated rules and regulations; educate businesses; Provide DWSMA map to road authorities; WHP education and
Release newsletter and other educational materials about wellhead protection; Distribute brochures and fact sheets explaining the purpose of the WHP plan; Cosponsor kids water festival; Promote sealing of unused, unsealed wells; Locate existing or new wel
The Upper Minnesota River Water Quality Assessment Project will complete water chemistry assessments of the upper reaches of the Minnesota River Headwaters, which includes the main stem of the river, five main tributaries (Meadowbrook Creek, Salmonsen Creek, Fish Creek, Hoss Creek, Little Minnesota River and Stoney Run Creek), and one flowage lake (Long Tom).
The Bois de Sioux Watershed District intends to begin a program to repair the legal ditches it owns and maintains for the purpose of improving water quality within the watershed and downstream receiving waters. The intent of this effort is to complete a pilot project to a legal ditch system that is in disrepair and use it as an example to educate landowners along other legal ditches on the importance of water quality. This pilot project consists of the construction of berms and side inlet culverts for sediment control along Traverse County Ditch #17 (TCD 17) and its single branch (B1) .
Tetra Tech will work to support the science needed when planning in Minnesota for water storage practice implementation. The goal is to provide practical water storage recommendations that can be incorporated into smaller scale planning within major watersheds (HUC 8), as well as larger scale planning for the Sediment Reduction Strategy for the Minnesota River and South Metro Mississippi River.