This education project will continue building the next generation of conservationists in Minnesota by engaging youths and adults in science and outdoor learning through radio, podcasts, newsletters and schoolyard exploration.
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
The Children’s Discovery Museum (CDM) continued aggressive School Service Program (SSP) enrollment strategies to reach the seven new counties of Becker, Lake of the Woods, Mahnomen, Mille Lacs, Morrison, Todd, and Wadena. A new Wizard of Oz exhibit was mounted in time for the 75th Anniversary Celebration, June 10-14, 2014.
This pilot program protected 1,210 acres of wild rice lake shoreland habitat in the Northern Forest Section by securing 14 permanent RIM conservation easements and four fee-title acquisitions, surpassing our goal of 700 acres, and doing so $250,202 under budget.
to construct phase 4 of the Shingobee Connection, which is a bike/pedestrian bridge across Pumphouse Bay of Leech Lake adjacent to the existing road bridge
State leadership for the 4-H Shooting Sports & Wildlife Program, including staff and 4-H volunteer committee members, will provide a menu of equipment options for local programs to choose from as a means to build their Shooting Sports & Wildlife project. Local programs will submit a grant application justifying how the new equipment will help them build and grow their program, attract and engage new audiences, and provide sustainability in their local chapter.
The Children's Discovery Museum in Grand Rapids will build on recent enrollment momentum and further increase participation with its School Service Program, which takes down the economic barriers for visiting school groups. The Legacy grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance, art and teaching supplies, and the addition of a new exhibit to the museum.
This contract is a component of larger project (Snake River E.coli Microbial Source Tracking Study – Cycle II) in the Snake River Watershed located in the St. Croix river basin. The study will address microbial water quality impairments in the watershed. This study will conduct fecal bacteria source tracking using genetic markers across impaired streams in the watershed during the spring and summer months of 2021.
This project will complete a Total Maximum Daily Load (TMDL) study for the impaired reaches of the Snake River Basin. The project includes development of a Generalized Watershed Loading Function (GWLF) model for nutrient sources and Total Suspended Sediment (TSS), a spreadsheet version of a BATHTUB model of lake response for four lakes, and a bacteria source assessment. Wenck will also provide all stream channel data as a spreadsheet and locational database.
The purpose of the project is to reduce sediment and nutrient deposition in surface waters within priority areas of the watershed. A five percent reduction goal has been established in the County Local Water Management Plan and Impaired Waters project in progress. Eleven Best Management Practice (BMP) installations are planned for this project in cooperation with local landowners, Cities, Townships and Lake Associations.
The Project and Outreach Coordinator will facilitate efforts within the watershed to provide landowner support and assistance in identifying areas in need of conservation plans and best management practices. The coordinator would use the Watershed Protection and Restoration Strategy Report and county water plans to target and prioritize outreach and education to maximize water quality benefits. This will greatly multiply the number of educated landowners in the watershed and increase the number of projects implemented.
This phase of the project will complete a TMDL for the impaired reaches of the Snake River Basin. The project includes development of a Unit Area Load model for nutrient sources, a spreadsheet version of a BATHTUB lake response for four lakes, and a bacteria source assessment. Contractor will also provide all stream channel data as a spreadsheet database and in GIS.
Created and installed a permanent exhibit on the history of Princeton through historic art in the Great Northern Room of the Depot Museum in Princeton.
Information letter to County Emergency Manager and Fire Dept. in the event of a spill. Seal one city well and 2 private wells. (401077, H00348446, H00348445)
Develop and design a WHP webpage; Purchase and install WHP signs near major transportation corridors; Distribute educational materials to landowners and businesses in the DWSMA