All Projects

3166 Results for
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
City of Oronoco
2025 Fiscal Year Funding Amount
$170,000

Completion of the Master Plan for the Zumbro River Regional Water Trail (ZRRWT). Roughly 150 miles of navigable waters that wind through a diverse landscape before joining the Mississippi River.

Blue Earth
Dodge
Faribault
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Steele
Wabasha
Waseca
Winona
Recipient
Zumbro Watershed Partnership
2016 Fiscal Year Funding Amount
$300,000
Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
Zumbro Watershed Partnership
2012 Fiscal Year Funding Amount
$75,000
2013 Fiscal Year Funding Amount
$75,000

OVERALL PROJECT OUTCOME AND RESULTS
This project identified and prioritized areas in the Zumbro River Watershed that were determined critical for restoring and protecting water quality. Studies suggested that small areas of the landscape contribute disproportionately to nonpoint source pollution. So implementation of conservation projects that focus on those areas will maximize water quality benefits and ensure efficient use of resources.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
Zumbro Watershed Partnership Inc
2018 Fiscal Year Funding Amount
$10,600
Fund Source

This project will build upon the outreach and education efforts of the Zumbro Watershed Restoration and Protection Strategy (WRAPS). The targeted area will be residents of the Zumbro River Watershed, specifically individuals and organizations that are not professionally involved in managing natural resources. This project will provide necessary outreach and education during the interim between the Zumbro WRAPS and beginning the One Watershed, One Plan process.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha