Remove concrete, fill annular space with grout, fabricate well head, paint interior piping, reinstall pump, motor and drop pipe to stop potential source of contamination from entering city wells.
Find site and develop well for city residents. Drill two test wells, supply and install well screen for two test wells, and grout, log and sample two wells.
This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.
Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.
This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.
The South Fork Crow River Comprehensive Watershed Management Plan (SFCR CMWP) identifies priority concerns, short-term and long-term goals for drainage water management, loss of water storage and altered hydrology, nutrient loading to surface waters, wind and water erosion, and soil health. Through the plan, specific details for structural and management practices are described in the implementation schedule for each of the planning regions and priority areas.