All Projects

103 Results for
Recipient
Wilkin SWCD
2014 Fiscal Year Funding Amount
$165,000
Fund Source

The Red River is impaired for sediment. This project will install best management practices to repair severe gullies that are contributing massive sediment loads to the Red River. The City of Moorhead also draws water from the Red River for its drinking water supply downstream. The proposed practices will reduce water treatment costs upon installation. Grant funds will be used to install four grade stabilization structures. These structures will control concentrated runoff and reduce flow velocities.

Wilkin
Recipient
Buffalo-Red River WD
2020 Fiscal Year Funding Amount
$1,400,000
Fund Source
Clay
Wilkin
Recipient
Wilkin SWCD
2017 Fiscal Year Funding Amount
$122,750
Fund Source

Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.

Wilkin
Recipient
Bois de Sioux WD
2018 Fiscal Year Funding Amount
$271,879
Fund Source
Traverse
Wilkin
Otter Tail
Grant
Stevens
Big Stone
Recipient
Buffalo-Red River WD
2018 Fiscal Year Funding Amount
$232,470
Fund Source
Clay
Wilkin
Recipient
Area 1 - Red River Valley Conservation Service Area
2019 Fiscal Year Funding Amount
$240,000
Fund Source
Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Wilkin SWCD
2019 Fiscal Year Funding Amount
$100,000
Fund Source

Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.

Wilkin
Recipient
Wilkin SWCD
2019 Fiscal Year Funding Amount
$35,000
Fund Source
Wilkin
Recipient
Wilkin SWCD
2020 Fiscal Year Funding Amount
$135,234
Fund Source
Wilkin
Recipient
Area 1 - Red River Valley Conservation Service Area
2021 Fiscal Year Funding Amount
$5,000
Fund Source
Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Wilkin SWCD
2021 Fiscal Year Funding Amount
$135,234
Fund Source
Wilkin
Recipient
Wilkin SWCD
2022 Fiscal Year Funding Amount
$235,560
Fund Source

The goal of our project is to protect & restore the Moorhead & Breckenridge, MN Public water supply. This will be achieved by protecting the Buffalo & Wahpeton Buried Aquifer's and to protect & restore the surface water's that enter the Red River of the North. According to the 2019 MPCA Report of the Red River of the North, the tributaries in the Red River Basin are delivering too much sediment and nutrients to the Red River.

Wilkin
Recipient
Wilkin SWCD
2022 Fiscal Year Funding Amount
$127,152
Fund Source
Wilkin
Recipient
Wilkin SWCD
2022 Fiscal Year Funding Amount
$30,000
Fund Source
Wilkin
Recipient
Area 1 - Red River Valley Conservation Service Area
2022 Fiscal Year Funding Amount
$242,500
Fund Source
Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Wilkin SWCD
2023 Fiscal Year Funding Amount
$117,801
Fund Source
Wilkin
Recipient
Wilkin SWCD
2024 Fiscal Year Funding Amount
$195,000
Fund Source
Wilkin
Recipient
Wilkin SWCD
2023 Fiscal Year Funding Amount
$127,137
Fund Source
Wilkin
Recipient
Wilkin SWCD
2023 Fiscal Year Funding Amount
$30,000
Fund Source
Wilkin
Recipient
Area 1 - Red River Valley Conservation Service Area
2024 Fiscal Year Funding Amount
$242,500
Fund Source
Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Wilkin SWCD
2024 Fiscal Year Funding Amount
$35,000
Fund Source
Wilkin
Recipient
Area 1 - Red River Valley Conservation Service Area
2025 Fiscal Year Funding Amount
$242,500
Fund Source
Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Wilkin SWCD
2025 Fiscal Year Funding Amount
$35,000
Fund Source
Wilkin
Recipient
Wilkin SWCD
2025 Fiscal Year Funding Amount
$120,000
Fund Source
Wilkin
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$14,950
Fund Source

This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.

Grant
Otter Tail
Traverse
Wilkin
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$14,997
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Big Stone
Grant
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$10,381
Fund Source

This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.

Grant
Otter Tail
Traverse
Wilkin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source

The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2. 

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
RESPEC
2022 Fiscal Year Funding Amount
$29,991
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Wilkin
Otter Tail
Clay
Becker
Recipient
Buffalo - Red River Watershed District
2012 Fiscal Year Funding Amount
$57,818
Fund Source

Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.

Becker
Clay
Otter Tail
Wilkin
Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red Rivers Watershed District
2019 Fiscal Year Funding Amount
$38,835
Fund Source

This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Wilkin
Recipient
Buffalo-Red River WD
2022 Fiscal Year Funding Amount
$1,296,838
Fund Source

1W1P implementation within the Buffalo-Red River watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River WD
2021 Fiscal Year Funding Amount
$1,296,838
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River WD
2024 Fiscal Year Funding Amount
$1,906,278
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$249,968
Fund Source

The Buffalo River Watershed Pilot Project is one of two pilots in Minnesota designed to develop a watershed approach for managing Minnesota’s surface waters. The goal of this project is to develop a plan that will guide surface water quality management throughout the watershed.

Becker
Clay
Otter Tail
Wilkin