Continue to support a volunteer corps for the Tamarack Nature Center and Discovery Hollow and Garden Area. Volunteers assist with programs, assist with animal care, assist with natural resource preservation and restoration, and assist with special events and projects. Recruit, train, recognize, and manage volunteers.
At Bald Eagle-Otter Lakes Regional Park start construction of two-acre nature play area and one-acre children's garden (including garden house for multi-purpose programs) at Tamarack Nature Center. A? Play area development to include rock climbing area, cascading play stream, stumps and hollows play area, sledding hill, arbor gathering, seating area, fencing, pathways and landscaping. A?
Protected through fee title acquisition 340 acres of priority forestland habitat in the northern and southeast ecological sections of the state. All parcels have been included in the DNR State Forest system; providing for long-term, ongoing protection and management of lands for the benefit of all Minnesotans.
Having current and accurate data on historic and archaeological sites is important to understanding our past and to preserving Minnesota’s history for future generations. In 2010-2011, the Minnesota Historical Society awarded contracts for these survey projects:
Each fiscal year of ACHF funding, a majority of the twelve regional library systems agree to allocate 10% of their ACHF funding to support statewide partnership projects. SELCO serves as the fiscal agent for statewide projects.
Bald Eagle Lake is a popular recreational lake known for its fishery on the Metropolitan Council's Priority Lakes List. The lake is negatively impacted by excess nutrients and restoring its water quality is a local priority.
This project will collect stormwater runoff from an approximately 900 acre area and re-use it to irrigate an existing golf course. This innovative project will provide a multitude of environmental benefits for Bald Eagle Lake including significant runoff volume reduction, groundwater recharge and phosphorus load reduction.
Capitol Region Watershed District will partner with local organizations and private landowners to implement a variety of cost-effective Best Management Practices in the East Kittsondale subwatershed. The urbanized condition of the 1,860 acre subwatershed results in an estimated 1,500 pounds of phosphorus, over 470,000 pounds of sediment, and significant concentrations of bacteria associated with that sediment being sent untreated to the Mississippi River each year. Those pollutants have contributed to several impairments within the river.
The Children's Discovery Museum's (CDM) new 3,000 piece Wizard of Oz (WOZ) collection will be properly archived, conservation materials purchased, and exhibit concept and design drawings completed. CDM facilitators and educators will travel to other children's museums in Minnesota for staff enrichment and professional development.
Grants to counties to implement SSTS programs including inventories, enforcement, development of databases, and systems to insure SSTS maintenance and of reporting program results to BWSR and MPCA and base grants.
The Ramsey Conservation District is partnering with the Vadnais Lake Area Water Management Organization, St. Paul Regional Water Service, and Ramsey County Parks and Recreation to restore and stabilize approximately 550 linear feet of streambank along the Sucker Lake Channel in northeastern Ramsey County with a cost effective critical area planting, replacing the existing mix of turf grass and asphalt streambank with a native vegetation planting.
The project will work with county and Waseca Soil and Water Conservation District staff to increase knowledge and participation in the Watershed Approach efforts and provide input to the Watershed Restoration and Protection Strategies (WRAPS) document.
The Le Sueur Watershed Technician will provide highly focused targeting of conservation programs and practices in this key watershed. The technician will enhance current staff capabilities in the Le Sueur watershed by collecting landowner contact information, producing landowner mailings about funding opportunities, and meeting one-on-one with landowners to discuss conservation concerns they may have. This has been a highly successful method for targeting projects, project identification, landowner contact, and project follow through.
This project will complete a Acetochlor Impairment Response Report. This report will combine and coordinate information relating to actions being done in direct response to the acetochlor water quality impairments with those being done and support MDA’s on-going responsibility to assure pesticides are used in a manner that does not cause unreasonable adverse effects on the environment.
This project will provide additional monitoring data to be utilized in the watershed assessment process for the Le Sueur River Watershed Project. Monitoring will take place for an additional year at two sites along the Maple River.
This project will identify priority management zones (PMZ), for the purposes of water quality restoration and protection, within the LeSueur River major watershed. This project is only one component of a larger effort in the LeSueur watershed to complete Total Maximum Daily Load (TMDL) studies while engaging citizens and landowners in land management planning.
Supplement Way finding implementation costs for cross-country ski trails at Battle Creek Regional Park, Tamarack Nature Center, and Grass-Vadnais-Snail Lakes Regional Park. *( 2013 winter visits; Bald Eagle Otter Lake, 21,800 visits; Battle Creek Regional Park, 62,600 visits; and Grass Vadnais Snail Lakes Regional Park, 62,100 visits).
This project will complete the dataset required for assessment of Aquatic Recreation Use at 8 stream sites and 11 lake sites in the Sand Hill Watershed.
This project will assess lakes and streams in the Cannon River watershed that have not been assessed to determine if they are meeting their designated uses. Some of these lakes and streams have data for certain pollutants, but not enough to complete an impairment assessment. The river and stream reaches are located in Dakota, Goodhue, Le Sueur, Rice, Steele, and Waseca counties. The lakes are located throughout the Cannon watershed (Le Sueur, Rice and Waseca Counties). This project will be a continuation of past assessments conducted in 2007 and 2009.
This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.
This project will obtain lab and field data for waterbodies within the Wild Rice Watershed, to meet surface water assessment goals. Data will continue to be collected further upstream of some 2008 sites and enhance current assessment datasets. Some new tributaries, that lack assessment data, will also be monitored. The project goal is to complete the datasets necessary for the assessment of Aquatic Recreation Use for twelve streams in the Wild Rice Watershed.
This project will include stream monitoring of six preselected sites from the Leech Lake Watershed (HUC 07010102) and Pine River Watershed (HUC 07010105). The sites will be monitored for chemical, physical and biological parameters for two years.
A partnership of local agencies and organizations will monitor water quality at eighteen carefully chosen sites within the Red Lake River and Grand Marais Creek watersheds. Fourteen monitoring sites have been chosen within the Red Lake River watershed. Four sites have been chosen in the Grand Marais Creek watershed. Each of these sites will provide a representative assessment of the water quality conditions within one or more minor subwatersheds at the 12-digit hydrologic unit code (HUC12) level.
This project will collect water quality data for 13 Hubbard County lakes located in the Crow Wing priority watershed and identified as priority lakes by the MPCA. Upon completion the project data set will include all of the necessary information for the lakes to be assessed for impairment due to nutrients. Volunteers will collect samples from 7 of the 13 lakes and paid SWCD staff will collect samples from 6 of the lakes that do not have public access or volunteers willing to sample. The water samples will be collected 5 times/year June-September in 2010 and 2011.
This project will obtain a lake data set for Douglas County while fostering lake association participation, ownership, and understanding of their lakes. A better understanding of these lakes is necessary in order to meet goals established in the 2009-2019 Comprehensive Local Water Management Plan and enable 303(d) and 305(b) assessments. Lakes included in this project are: Agnes, Alvin, Blackwell, Brophy, Charley, Cook (Cork), Crooked (East), Crooked (NW), Echo, Henry, Lovera (Lovers), Mina, Round, and Spring.
Rice County Water Resources Division will complete a Surface Water Assessment for six lakes located in the Cannon River Watershed. The lakes chosen include: Sprague Lake (66-0045-00), Mud Lake (66-0054-00), Hatch Lake (66-0063-00), Pooles Lake (66-0046-00), Logue Lake (66-0057-00), and Phelps Lake (66-0062-00). Each lake chosen is currently unassessed, and both Sprague and Mud lake are priority lakes for testing. Sampling will include testing dissolved oxygen, temperature, pH, Secchi, Total phosphorus, and chlorophyll-a. The samples will be taken by volunteers and paid staff.
This project will collect water quality data at sites within the Thief River watershed. Nine monitoring sites were chosen at strategic locations along the Thief River and its significant tributaries.
This project will be a joint effort between the Todd Soil & Water Conservation District (SWCD) and the Sylvan Shores residents. Todd SWCD will organize and coordinate the project in full partnership with the Sylvan Shores residents. The actual monitoring will be a cooperative effort between Todd SWCD staff and citizen volunteers at Fawn and Pine Island Lakes.