The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program FORTRAN (HSPF) model for the Snake River Watershed in the Red River Basin. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
This project will result in the completion of the first phase of the Watershed Restoration and Protection Strategy (WRAPS) for the Snake-Middle River Watershed.
The goal of this project is to utilize the information and data collected in the Phase 1 project to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase 2 project will allocate pollutant reductions goals and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.
This project seeks to inventory twenty registered feedlots identified as having an Unpermitted Liquid Manure Storage Area. Specifically, this inventory would include offering cost-share for soils investigations. These feedlots are located in three townships that have also been identified as having groundwater that is vulnerable to nutrient pollution, necessitating a need for nitrate testing per MN Department of Agriculture. These townships also house the vast majority of remaining unpermitted Liquid Manure Storage Areas in the County.
The Somali Museum of Minnesota will curate and present two new monthly series of public programs designed to amplify, celebrate, and preserve Somali culture. The first series will be gallery-based and draw from the museum’s collection to offer Somali language, cultural and history instruction targeted to Somali families and school age youth. The second series, designed for a broader audience, will present artist talks and demonstrations, dance performances, exhibitions, and poetry readings.
Prepare preliminary engineering report to help identify feasibility of adding a second intake upstream of current intake.
Prepare preliminary engineering report to help identify feasibility of adding a second intake upstream of current intake.