The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program FORTRAN (HSPF) model for the Snake River Watershed in the Red River Basin. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
This project will result in the completion of the first phase of the Watershed Restoration and Protection Strategy (WRAPS) for the Snake-Middle River Watershed.
The goal of this project is to utilize the information and data collected in the Phase 1 project to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase 2 project will allocate pollutant reductions goals and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
Implement cover crops, no tillage management, forestry improvements, and prescribed grazing to improve soil health, sequester carbon, and protect drinking water within the southwestern portion of the Mississippi River-Sartell watershed, including areas immediate upsteam of the St. Cloud drinking water surface intake. This will be achieved by providing financial and technical assistance paired with targeted outreach and in combination with other CWF grant programs.
The Somali Museum of Minnesota will curate and present two new monthly series of public programs designed to amplify, celebrate, and preserve Somali culture. The first series will be gallery-based and draw from the museum’s collection to offer Somali language, cultural and history instruction targeted to Somali families and school age youth. The second series, designed for a broader audience, will present artist talks and demonstrations, dance performances, exhibitions, and poetry readings.
Unite Cloud will join with Farhiya Iman to host 12 Intro to Somali Language and Culture sessions. Also, Farhiya will develop a curriculum for a new class: Advanced Somali Language and Culture. Once the class is built, we will host 9 Advanced classes.
Ka Joog requests funding from the Minnesota Humanities Center to offer songwriting and composition to Somali American youth enrolled in FANKA, our arts education program. We will contract with Nimcaan Hilaac, a renowned Somali American songwriter, singer, and composer. We will offer 210-300 Somali youth in Minneapolis, Saint Paul, and Saint Cloud songwriting workshops facilitated by Mr. Hilaac. Their learning will culminate in a community-wide event featuring performances by our youth.
Promote water protection and conservation at Middle Spunk Water Festival as an educational Sponsor, update and maintain city web site with water protection and conservation information, promote community awareness and education on Source Water Protection
Prepare preliminary engineering report to help identify feasibility of adding a second intake upstream of current intake.
Prepare preliminary engineering report to help identify feasibility of adding a second intake upstream of current intake.