The concrete floor in the exhibit and storage area of a former garage structure, located on the Clearwater Historical Society museum grounds, was removed and replaced. The severely deteriorated floor with an insafe step down had been barred to public access. With the floor replaced storage capacity has been increased, artifacts are more accessible, space is more usable and the building is now in compliance with ADA requirements.
This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.
The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.
Sandhill cranes have expanded their range in Minnesota and elsewhere and as populations have expanded several states, including Minnesota, have initiated sandhill crane hunting seasons and other states are considering doing the same. Partially this is in response to increasing complaints of crop degradation by sandhill cranes.
This Legacy grant will focus on the too-often neglected local school districts that have generally not participated in the CDM SSP at the same level as distant schools in surrounding counties. A new CDM interactive exhibit is badly needed to draw back visitors who have been looking for something new at the Museum for children.
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
The Children’s Discovery Museum (CDM) continued aggressive School Service Program (SSP) enrollment strategies to reach the seven new counties of Becker, Lake of the Woods, Mahnomen, Mille Lacs, Morrison, Todd, and Wadena. A new Wizard of Oz exhibit was mounted in time for the 75th Anniversary Celebration, June 10-14, 2014.
The Roseau River Watershed District in partnership with the Roseau County SWCD will complete a study to target and prioritize sites contributing impairments within legal drainage systems. Project partners will utilize data developed by the International Water Institute (IWI) Water Quality Decision Support Application that establishes multivariate scoring of each site based on all relevant features contributing to surface water degradation.
The Children's Discovery Museum in Grand Rapids will build on recent enrollment momentum and further increase participation with its School Service Program, which takes down the economic barriers for visiting school groups. The Legacy grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance, art and teaching supplies, and the addition of a new exhibit to the museum.
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
Clear well #1 and televise well for possible casing flow allowing for presence of VOC's in water; Create and mail Enbridge the DWSMA to inform them that the pipeline runs through the DWSMA
Current and accurate data on historic and archaeological sites is crucial to understanding our past and to preserving Minnesota's history for future generations. In fiscal years 2012 and 2013, the Minnesota Historical Society, the Office of the State Archaeologist and the Minnesota Indian Affairs Council awarded contracts for the following projects: Archaeological Surveys in Steele, McLeod and Red Lake Counties.
Each fiscal year of ACHF funding, a majority of the twelve regional library systems agree to allocate 10% of their ACHF funding to support statewide partnership projects. SELCO serves as the fiscal agent for statewide projects.
Stormwater along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.
Erosion from streambanks and fields along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.
The Children's Discovery Museum's (CDM) new 3,000 piece Wizard of Oz (WOZ) collection will be properly archived, conservation materials purchased, and exhibit concept and design drawings completed. CDM facilitators and educators will travel to other children's museums in Minnesota for staff enrichment and professional development.