The goal of this project is to utilize the information and data collected in the Phase 1 project to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase 2 project will allocate pollutant reductions goals and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
This project will result in the completion of the first phase of the Watershed Restoration and Protection Strategy (WRAPS) for the Snake-Middle River Watershed.
Clear well #1 and televise well for possible casing flow allowing for presence of VOC's in water; Create and mail Enbridge the DWSMA to inform them that the pipeline runs through the DWSMA
Current and accurate data on historic and archaeological sites is crucial to understanding our past and to preserving Minnesota's history for future generations. In fiscal years 2012 and 2013, the Minnesota Historical Society, the Office of the State Archaeologist and the Minnesota Indian Affairs Council awarded contracts for the following projects: Archaeological Surveys in Steele, McLeod and Red Lake Counties.
Each fiscal year of ACHF funding, a majority of the twelve regional library systems agree to allocate 10% of their ACHF funding to support statewide partnership projects. SELCO serves as the fiscal agent for statewide projects.
We will deploy acoustic detectors and revisit roost trees identified in our previous ENRTF project to measure effect of seven years of white-nose syndrome on Minnesota bats.
Stormwater along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.
Erosion from streambanks and fields along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.
This project seeks to provide data on insecticide contamination in the soil and the insect community across the state and the effect of sublethal insecticide exposure on insect reproduction.
To support teachers in addressing new science standards , we propose a series of workshops across Minnesota facilitating conversation about sustainability and water conservation, specifically integrating western science and Indigenous perspectives.
This project will complete the dataset necessary for assessment of water quality on Brooks Creek, Black River, Lost River, Poplar River, and Hill River. By monitoring these five sites, Red Lake County SWCD will have collected baseline information on all of the Streams/Creeks in Red Lake County.
A partnership of local agencies and organizations will monitor water quality at eighteen carefully chosen sites within the Red Lake River and Grand Marais Creek watersheds. Fourteen monitoring sites have been chosen within the Red Lake River watershed. Four sites have been chosen in the Grand Marais Creek watershed. Each of these sites will provide a representative assessment of the water quality conditions within one or more minor subwatersheds at the 12-digit hydrologic unit code (HUC12) level.
This project will collect water quality data at sites within the Thief River watershed. Nine monitoring sites were chosen at strategic locations along the Thief River and its significant tributaries.
This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.