We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.
This full-scale pilot will evaluate supercritical water oxidation (SCWO) for managing PFAS in biosolids and water treatment residuals. SCWO can destroy PFAS in a variety of wastes and recover energy.
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.
This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.
The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).
A century of channel straightening efforts has significantly reduced the habitat quality within the BRRWD. The BRRWD has identified, with preliminary designs completed, a number of straightened streams. In the second phase of this multi-phase project, the BRRWD in partnership with landowners, federal, state, and local agencies, will restore 7 miles of the Upper Buffalo River channel and riparian habitat corridor, and 4.2 miles of the South Branch Buffalo River channel and riparian habitat corridor.
This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).
A century of channel straightening has significantly reduced the stream habitat quality within the BRRWD. The BRRWD has identified, with preliminary designs completed, a number of straightened streams. In several multi-phase projects, the BRRWD in partnership with landowners, federal, state, and local agencies, will restore 3 miles of targeted stream and their respective riparian habitat corridors. Targeted restorations of straightened streams include the South Branch of the Buffalo River, Upper Buffalo River, Stony Creek, Whisky Creek, and Whiskey's Creek southern tributary.
We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
To hire a qualified architect to prepare a conditions assessment and planning documents for the Cathedral of the Immaculate Conception, proposed to be used as a community center, and listed in the National Register of Historic Places.
On many public lands in northwest Minnesota, cattail growth has far exceeded the distribution recommended for optimum wetland wildlife habitat and a need for cattail control has become recognized. Cattails have also recently been demonstrated to have bioenergy potential.
Pileated Woodpeckers are keystone habitat modifiers that support an array of game, non-game, and conservation concern species. Additional information is needed to understand cavity dynamics for these species.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
Rising temperatures and increased precipitation contribute to decreased oxygen and increased methane in Minnesota lakes and wetlands. We will identify impacts on water quality and methane emissions, providing management guidance.
Voyageurs Conservancy will connect 17,000 Minnesotans to the state's only national park through standards-aligned K-12 education, career-building fellowships, and enhanced programs that engage diverse audiences in the park's conservation.
Wilderness Inquiry will expand its work to provide a continuum of outdoor experiences for youth, adults, and families in communities across Minnesota by: