The program will roll out a series of interactive workshops led by esteemed Somali artists and educators. These workshops will cover various aspects of Somali arts, including traditional and contemporary music, poetry, dance, and visual arts, catering to all ages and skill levels.
We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To broaden public access to the Barnesville City Hall, listed in the National Register of Historic Places in continuous use since 1899, through the installation of an elevator and other appropriate modifications that satisfy the Americans with Disability Act
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the 1871 Bergquist Cabin, listed in the National Register of Historic Places.
To contract with qualified professionals to prepare construction documents for the preservation of the Bergquist Cabin, listed in the National Register of Historic Places.
To fabricate and install a historical marker that provides public access to the story of the John Bergquist House, listed in the National Register of Historic Places.
To hire a qualified professional to prepare a Historic Structures Report for the John Bergquist House, listed in the National Register of Historic Places.
To offer live performances to enhance the education, preservation, and promotion of Minnesota history and cultural heritage. Live performances at Big Stone County Fair will include a Bluegrass Band, a percussion group showcasing music from around the globe, a magician highlighting the history and heritage of magic, a caricature artist, and a vaudeville-style comedy troupe.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.
This full-scale pilot will evaluate supercritical water oxidation (SCWO) for managing PFAS in biosolids and water treatment residuals. SCWO can destroy PFAS in a variety of wastes and recover energy.
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.