The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
This project will support a co-creative engagement program with Leech Lake Band of Ojibwe children, families, and educators, highlighting the art, culture, and heritage of North Central Minnesota from the perspectives of Leech Lake Band of Ojibwe children.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.
This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.
This full-scale pilot will evaluate supercritical water oxidation (SCWO) for managing PFAS in biosolids and water treatment residuals. SCWO can destroy PFAS in a variety of wastes and recover energy.
The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.
This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.
The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).
We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
The Camp Ripley ACUB Phase VI project protected almost 1070 acres of high quality habitat along the Mississippi and Crow Wing Rivers and near the Nokasippi and Gull River WMAs through approximately 14 conservation easements.
Phase 11 of the Camp Ripley Sentinel Landscape ACUB Partnership will utilize permanent conservation easements (BWSR RIM) to acquire 1,150-acres of high quality habitat in order to accomplish: PERMANENT PROTECTION of habitat corridors and buffers around public lands, PRESERVE open space within the CRSL, and conservation enhancement and restoration PRACTICES to protect soil and water quality and habitat corridor connectivity.
Phase VIII of the RIM Camp Ripley Sentinel Landscape ACUB Partnership utilized permanent RIM conservation easements to acquire 1,755-acres of high quality habitat within the ACUB work area. We secured 7 easements including the two one contiguous block but done as two easements for legal reasons) Cushing Land Company easements that totaled 1,464 acres. In total one of the largest RIM easements ever acquired.
Phase IX of the RIM Camp Ripley Sentinel Landscape ACUB Partnership secured 7 permanent RIM conservation easements to protect 539-acres of high quality habitat. We hit the estimated number of acres from the original Accomplishment Plan. BWSR utilized the RIM easement process in partnership with the Morrison SWCD to secure habitat corridor easements on sites within Crow Wing, Cass, and Morrison counties during the appropriation term.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
The project protect approximately 1090 acres of habitat for fish, game and wildlife with easements along the Mississippi and Crow Wing Rivers and tributaries. Protection will reduce infringement and development and improve watershed function.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.
Pileated Woodpeckers are keystone habitat modifiers that support an array of game, non-game, and conservation concern species. Additional information is needed to understand cavity dynamics for these species.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
The Chippewa River Watershed Association (CRWA) will lead programs to tell a watershed story on the state of our waters and efforts needed to protect or restore them. The CRWA will partner with local offices on existing local educational efforts and will support these types of events. Activities will focus on priority areas and information sharing as outlined in the Chippewa River Watershed Restoration and Protection Strategies (WRAPS) Public Participation Plan.
The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (Minnesota Pollution Control Agency (MPCA), Chippewa River Watershed, and local partners). The MPCA and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners want to engage in for the second round of the WRAPS process.