The program will roll out a series of interactive workshops led by esteemed Somali artists and educators. These workshops will cover various aspects of Somali arts, including traditional and contemporary music, poetry, dance, and visual arts, catering to all ages and skill levels.
We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To broaden public access to the Barnesville City Hall, listed in the National Register of Historic Places in continuous use since 1899, through the installation of an elevator and other appropriate modifications that satisfy the Americans with Disability Act
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the 1871 Bergquist Cabin, listed in the National Register of Historic Places.
To contract with qualified professionals to prepare construction documents for the preservation of the Bergquist Cabin, listed in the National Register of Historic Places.
To fabricate and install a historical marker that provides public access to the story of the John Bergquist House, listed in the National Register of Historic Places.
To hire a qualified professional to prepare a Historic Structures Report for the John Bergquist House, listed in the National Register of Historic Places.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.