The Elm Creek Commission had previously completed subwatershed assessments in two areas of the watershed. The Rush Creek Headwaters subwatershed includes much of western Corcoran and parts of Rogers, which are drained by North Fork Rush Creek. The Diamond Creek SWA assessed the direct drainage area to French and Diamond Lakes, and the area tributary to downstream Diamond Creek. This project would support implementation of projects and practices identified in the Rush Creek Headwaters and Diamond Creek SWAs.
Provide contract management to ENRTF pass-through appropriation recipients for approximately 115 open grants. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved work plans.
Como Apprentice Program is an education program that supports students looking to gain professional experience and learn more about the plants and animals. The program structure is the student is offered a 2 year paid internship through the City's RightTrack program and the apprentice support and education is supported through this EdZooCation program that includes career development education classes, workshops and training.
Implement various aspects of the River First Plan for Above the Falls Regional Park, including, potentially, riverside park spaces at Upper Harbor Terminal, extended trail connections, bridge retrofits for pedestrian and bicycle access to trails, a river overlook and critical trail gap at 26th Avenue North, and shoreline restoration on MPRB-owned property throughout the corridor. Funded work could include design, engineering, administration, earthwork, trails, shoreline enhancement, natural areas, buildings, comfort facilities, interpretive facilities, and signage.
This program will complete the initial WMA site development on 1,500 acres of land acquired in the Accelerated Prairie Grassland WMA and Accelerated Wetland WMA Acquisition programs to meet standards for inclusion in the Outdoor Recreation System. This program will also accelerate the restoration, enhancement and management of at least 5,180 acres of native prairie vegetation on existing public lands.
This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
This program will acquire and develop approximately 730, acres of new Wildlife Management Area (WMA) lands. New WMA acquisition acre targets by LSOHC Sections will be consistent with the recommendations of The Citizens Advisory Committee report of 2002? Wildlife Management Area Acquisition The Next 50 Years. Additionally, this program will protect 275 acres of native prairie as state Scientific & Natural Areas (SNAs) and perpetual Native Prairie Bank (NPB) easements.
This program will increase populations of a variety of game and non-game wildlife species by protecting and enhancing forest habitats on which wildlife depends. This program of on-the-ground forest conservation projects will amplify the wildlife value of forest communities on DNR administered forestlands. Our forest enhancement will treat 4,472 ac. These activities are not conducted as part of the DNR's commercial timber operations. Additionally, our program will acquire 404 acres of forestland that contributes to habitat complexes and other high priorities.
Pheasants Forever (PF) and the U.S. Fish and Wildlife Service (Service) will cooperate to permanently restore and protect approximately 700 acres as Waterfowl Production Areas (WPAs) in western and southern Minnesota. All lands acquired through this grant proposal will be owned and managed by the Service as part of the National Wildlife Refuge System.
This program uses a multi-programmatic approach to achieve prioritized aquatic habitat protection, restoration, and enhancement for lakes, trout streams, and rivers across Minnesota. We propose to: i) protect 7.8 miles of shoreline on lakes, rivers and trout streams; ii) effect structural repairs to 2 lake outlet control structures that will integrate fish passage; iii) restore and enhance river and stream functions that will benefit over 50.5 river miles; and iv) enhance 1.4 miles of shoreline habitat on publicly-owned lakeshore.
The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
We propose restoration and enhancement of prairie and savanna on WMA’s, SNA’s, and Native Prairie Banks in Minnesota and restoration and enhancement of bluff prairies on State Forest Land in southeast Minnesota.
This proposal will accomplish shallow lake and wetland habitat work that will otherwise go unfunded. This work is called for in the Minnesota Prairie Conservation Plan, Long Range Duck Recovery Plan, and Shallow Lakes plan.