The Rice Lake Wetland Nutrient Reduction Project will provide nutrient reductions to downstream recreational water bodies by restoring the Rice Lake Wetland from its current area of 434 acres to pre-ditched water levels of approximately 896 acres.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
Using the Reinvest in Minnesota (RIM) program, this project addresses the potential loss of grassland habitats from conversion to cropland and accelerates grassland protection efforts not covered by other programs. Working in coordination with 11 Minnesota Prairie Conservation Plan Local Technical Teams (LTTs), and 64 local Soil & Water Conservation Districts (SWCDs) this proposal will enroll 490 RIM acres (approximately 7 easements), focusing on Minnesota Prairie Plan identified landscapes.
Using the Reinvest in Minnesota (RIM) program, this project addressed the potential loss of grassland habitats from conversion to cropland and accelerate grassland protection efforts not covered by other programs. Focusing on Minnesota Prairie Plan-identified landscapes and working in coordination with established Prairie Conservation Plan Local Technical Teams (LTTs), this project fulfilled the accomplishment plan goal of enrolling 710 acres of grassland habitat in permanent conservation easements by completing more easements than estimated, for a total of 13 easements.
Using the Reinvest in Minnesota (RIM) program, this project addressed the potential loss of grassland habitats from conversion to cropland and accelerated grassland protection efforts not covered by other programs. Focusing on Minnesota Prairie Plan-identified landscapes and working in coordination with established Prairie Conservation Plan Local Technical Teams (LTTs), this project completed 7 RIM conservation easements permanently protecting 617 acres of grassland habitat, exceeding the accomplishment plan goal by 23%.
Using the Reinvest in Minnesota (RIM) program, this project addresses the potential loss of grassland habitats from conversion to cropland and accelerates grassland protection efforts not covered by other programs. Working in coordination with 11 established Prairie Conservation Plan Local Technical Teams (LTTs), and local SWCDs this proposal will enroll 936 RIM acres (approximately 12 easements), focusing on Minnesota Prairie Plan identified landscapes.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
The Root (HUC 07040008) and Upper Iowa/Mississippi River – Reno (HUC 07060002 and 07060001) watershed Hydrologic Simulation Program – FORTRAN (HSPF) models currently simulate hydrologic and water quality processes through 2015. In order to support work to update the existing WRAPS report, the two HSPF models will be extended through 2021.
The contractor will use the Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.
This grant will fund about 80 project in six sub-watersheds (Headwaters of the Middle & South Branch, Money Creek, Headwaters of Upper Iowa River, Mill Creek, south Fork Root River, and Carey Creek). Projects to include grassed waterways, water and sediment control basins, grade stabilization structures, livestock waste projects, streambank projects and cover crops. Funding will also support staff time for project development and technical assistance for the cost-share projects.
This grant will fund an expected 44 projects in 4 subwatersheds (South Fork Root River, Crooked Creek, Rush-Pine and portions of the headwaters of the Middle and South Branch Root) and 2 DWSMAS (Chatfield and Utica). Projects include grassed waterways, WASCOBs, grade stabilization structures and cover crops, plus field walkovers, project development, and technical assistance. The anticipated sediment reduction from this work will be 2,285.5 tons, or 2.2% of the 10-year goal for the entire planning area.
The purpose of this project is to assess the amount of land in the Root River watershed that is treated by structural best management practices (BMPs); more specifically, Water and Sediment Control Basins. The 2016 Root River Watershed Restoration and Protection Strategy (WRAPS) report recommended reducing sediment loss from upland areas and reducing nitrate loading to streams from runoff. Understanding the location and density of these BMPs will is important for targeting future watershed protection and restoration efforts.
The Root River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Fillmore Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations for five subwatershed sites. Samples will be collected using procedures described in the WPLMN standard operating procedures.
The Nature Conservancy acquired in fee 3 properties that added 143 acres to the RJ Doer Memorial Hardwood Forest. The Minnesota Land Trust protected 3 properties with perpetual easements totaling 526 acres. The Nature Conservancy enhanced 396 acres of high priority habitat (bluff prairie and oak savanna) on existing state forest and Scientific and Natural Area lands, and an additional 35 acres on new fee acquisitions.
TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.
The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.
The CREST team wants to create a mobile lab with innovative, engaging educational activities that would be used to travel to underserved, underrepresented schools and community events in Northwest Minnesota
Sandhill cranes have expanded their range in Minnesota and elsewhere and as populations have expanded several states, including Minnesota, have initiated sandhill crane hunting seasons and other states are considering doing the same. Partially this is in response to increasing complaints of crop degradation by sandhill cranes.
To sensitively rehabilitate Scanlan Hall, a contributing feature of the Lanesboro Historic District listed in the National Register of Historic Places, with Americans with Disabilities Act-compliant access to the Lanesboro Art Center