This project will, over a 27 month period, fund a 0.75 Full Time Equivalent Conservation Planning Specialist position to update approximately 400 United States Department of Agriculture Highly Erodable Lands conservation plans on 40,000 acres in high priority areas within the Root River watershed. Currently, only 5% of the USDA conservation plans -approximately 40 per year - are being checked for compliance, and this project will increase that number to 150 or more per year.
Funding was used to design, install and evaluate deterrent barrier options in Minnesota and to cost share a barrier in northwest Iowa to limit or slow the movement of Invasive carp.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
Minnesota Trout Unlimited, the Minnesota Land Trust, The Nature Conservancy, and Trust for Public Land will combine their expertise in six targeted watersheds to increase the resilience of remnant populations of brook trout unique to Southeast Minnesota. We will protect and enhance habitat in floodplains, along gullies, above steep slopes, and on bluffs to slow runoff, increase infiltration, and keep aquatic habitat productive.
Minnesota Trout Unlimited, the Minnesota Land Trust, and The Nature Conservancy will combine their expertise within 12 targeted watersheds to increase the resilience of remnant populations of brook trout unique to Southeast Minnesota. We will protect 535 acres and restore/enhance 95 acres of instream and adjacent upland habitats to address stream degradation (floodplains, gullies, slopes, and bluffs), slow runoff, increase infiltration, and keep aquatic habitat productive.
RIM Wetlands - Restoring the most productive habitat in Minnesota will protect and restore approximately 495 acres of previously drained wetlands and adjacent native grasslands on approximately 11 easements across the State to restore wetlands and associated uplands for habitat and associated benefits. The Board of Water and Soil Resources (BWSR) will utilize the Reinvest in Minnesota (RIM) easement program in partnership with local Soil and Water Conservation District (SWCDs) to target, protect and restore high priority habitat.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
The Root (HUC 07040008) and Upper Iowa/Mississippi River – Reno (HUC 07060002 and 07060001) watershed Hydrologic Simulation Program – FORTRAN (HSPF) models currently simulate hydrologic and water quality processes through 2015. In order to support work to update the existing WRAPS report, the two HSPF models will be extended through 2021.
The contractor will use the Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.
This grant will fund about 80 project in six sub-watersheds (Headwaters of the Middle & South Branch, Money Creek, Headwaters of Upper Iowa River, Mill Creek, south Fork Root River, and Carey Creek). Projects to include grassed waterways, water and sediment control basins, grade stabilization structures, livestock waste projects, streambank projects and cover crops. Funding will also support staff time for project development and technical assistance for the cost-share projects.
This grant will fund an expected 44 projects in 4 subwatersheds (South Fork Root River, Crooked Creek, Rush-Pine and portions of the headwaters of the Middle and South Branch Root) and 2 DWSMAS (Chatfield and Utica). Projects include grassed waterways, WASCOBs, grade stabilization structures and cover crops, plus field walkovers, project development, and technical assistance. The anticipated sediment reduction from this work will be 2,285.5 tons, or 2.2% of the 10-year goal for the entire planning area.
The purpose of this project is to assess the amount of land in the Root River watershed that is treated by structural best management practices (BMPs); more specifically, Water and Sediment Control Basins. The 2016 Root River Watershed Restoration and Protection Strategy (WRAPS) report recommended reducing sediment loss from upland areas and reducing nitrate loading to streams from runoff. Understanding the location and density of these BMPs will is important for targeting future watershed protection and restoration efforts.
The Root River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Fillmore Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations for five subwatershed sites. Samples will be collected using procedures described in the WPLMN standard operating procedures.
The Nature Conservancy acquired in fee 3 properties that added 143 acres to the RJ Doer Memorial Hardwood Forest. The Minnesota Land Trust protected 3 properties with perpetual easements totaling 526 acres. The Nature Conservancy enhanced 396 acres of high priority habitat (bluff prairie and oak savanna) on existing state forest and Scientific and Natural Area lands, and an additional 35 acres on new fee acquisitions.
TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.
The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.
To sensitively rehabilitate Scanlan Hall, a contributing feature of the Lanesboro Historic District listed in the National Register of Historic Places, with Americans with Disabilities Act-compliant access to the Lanesboro Art Center