All Projects

4224 Results for
Recipient
Tetra Tech Inc
2021 Fiscal Year Funding Amount
$17,877
Fund Source

The contractor will use the  Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates  total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Fillmore SWCD
2022 Fiscal Year Funding Amount
$1,469,595
Fund Source

This grant will fund about 80 project in six sub-watersheds (Headwaters of the Middle & South Branch, Money Creek, Headwaters of Upper Iowa River, Mill Creek, south Fork Root River, and Carey Creek). Projects to include grassed waterways, water and sediment control basins, grade stabilization structures, livestock waste projects, streambank projects and cover crops. Funding will also support staff time for project development and technical assistance for the cost-share projects.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Winona SWCD
2018 Fiscal Year Funding Amount
$851,301
Fund Source

This grant will fund an expected 44 projects in 4 subwatersheds (South Fork Root River, Crooked Creek, Rush-Pine and portions of the headwaters of the Middle and South Branch Root) and 2 DWSMAS (Chatfield and Utica). Projects include grassed waterways, WASCOBs, grade stabilization structures and cover crops, plus field walkovers, project development, and technical assistance. The anticipated sediment reduction from this work will be 2,285.5 tons, or 2.2% of the 10-year goal for the entire planning area.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Winona State University
2019 Fiscal Year Funding Amount
$22,000
2021 Fiscal Year Funding Amount
$10,000
Fund Source

The purpose of this project is to assess the amount of land in the Root River watershed that is treated by structural best management practices (BMPs); more specifically, Water and Sediment Control Basins. The 2016 Root River Watershed Restoration and Protection Strategy (WRAPS) report recommended reducing sediment loss from upland areas and reducing nitrate loading to streams from runoff. Understanding the location and density of these BMPs will is important for targeting future watershed protection and restoration efforts.

Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Fillmore Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$72,239
2018 Fiscal Year Funding Amount
$42,477
2020 Fiscal Year Funding Amount
$25,018
2021 Fiscal Year Funding Amount
$25,018
2022 Fiscal Year Funding Amount
$46,273
2024 Fiscal Year Funding Amount
$39,788
Fund Source

The Root River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Fillmore Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations for five subwatershed sites. Samples will be collected using procedures described in the WPLMN standard operating procedures.

Fillmore
Houston
Recipient
The Nature Conservancy/MN Land Trust
2014 Fiscal Year Funding Amount
$1,644,600
Fund Source

The Nature Conservancy acquired in fee 3 properties that added 143 acres to the RJ Doer Memorial Hardwood Forest. The Minnesota Land Trust protected 3 properties with perpetual easements totaling 526 acres. The Nature Conservancy enhanced 396 acres of high priority habitat (bluff prairie and oak savanna) on existing state forest and Scientific and Natural Area lands, and an additional 35 acres on new fee acquisitions. 

Fillmore
Houston
Winona
Fund Source

Rehabilitation of State Trail Bridges along the Root River State Trail between the communities of Lanesboro and Rushford.

Fillmore
Fund Source

Rehabilitation of State Trail Bridges along the Root River State Trail between the communities of Lanesboro and Rushford.

Fillmore
Fund Source

Rehabilitation of State Trail Bridges along the Root River State Trail between the communities of Lanesboro and Rushford.

Fillmore
Fund Source

This project entailed reconstruction and renewal of 5.7 miles of the segment of the Root River State Trail that runs from Lanesboro to Whalan.

Fillmore
Recipient
Fillmore County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$319,700
Fund Source

TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$86,582
Fund Source

The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.

Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Winona SWCD
2020 Fiscal Year Funding Amount
$1,469,595
Fund Source
Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Rainy Lake Community Orchestra
2018 Fiscal Year Funding Amount
$4,344

Rural and Community Art Project Grant

Koochiching
Roseau
Lake of the Woods
Itasca
St. Louis
Stearns
Rice
Dakota
Recipient
Rainy Lake Community Orchestra
2017 Fiscal Year Funding Amount
$4,246

Rural and Community Art Project Grant

Koochiching
St. Louis
Itasca
Beltrami
Lake of the Woods
Hennepin
Ramsey
Stearns
Roseau
Rice
Becker
Recipient
Rainy Lake Community Orchestra
2019 Fiscal Year Funding Amount
$4,108

Rural and Community Art Project Grant

Koochiching
St. Louis
Benton
Stearns
Lake of the Woods
Dakota
Rice
Rice
Itasca
Recipient
Rushford Area Historical Society
2024 Fiscal Year Funding Amount
$3,750
Fillmore
Recipient
Stearns SWCD
2020 Fiscal Year Funding Amount
$294,950
Fund Source
Stearns
Recipient
Sauk River Watershed District
2016 Fiscal Year Funding Amount
$48,793
Fund Source

The project goal is to conduct water chemistry monitoring at one subwatershed site, one basin site, and one major watershed site in 2016 and 2017 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Stearns
Recipient
Sauk River Watershed District
2019 Fiscal Year Funding Amount
$135,478
2022 Fiscal Year Funding Amount
$128,521
Fund Source

This project will focus on monitoring & assessment, stressor ID assistance, problem investigation, watershed prioritization and targeting, Total Maximum Daily Load (TMDL) report development, Watershed Restoration and Protection Strategy (WRAPS) report updates and continuing civic engagement for the Sauk River Watershed.

Douglas
Meeker
Pope
Stearns
Todd
Recipient
RESPEC
2021 Fiscal Year Funding Amount
$24,891
Fund Source

The goal of this project is to compile the observed flow and water quality data and update the Sauk River Watershed HSPF model calibration through 2019. The Sauk River Watershed HSPF model simulates hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and chlorophyll a.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River WD, PF, MLT
2022 Fiscal Year Funding Amount
$4,034,000
Fund Source

This program will permanently protect, restore and enhance critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land conversion. Using conservation easements and fee land acquisition, we will protect approximately 660 acres of priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area. We will restore/enhance approximately 224 acres of wetlands and accompanying uplands to create habitat for waterfowl and populations of Species in Greatest Conservation Need (SGCN).

Douglas
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2013 Fiscal Year Funding Amount
$538,575
Fund Source

The Sauk River and its seven reservoir lakes are impaired for turbidity, e.coli and excessive nutrients. Local studies conducted on Sauk Lake, the Sauk River Chain of Lakes and the lower reach of the Sauk River identified urban stormwater runoff as a source of sediment and nutrient loading. This project will address stormwater runoff concerns within the communities of Sauk Centre, Cold Spring and St. Cloud by providing treatment through bioretention and infiltration.

Stearns
Recipient
Sauk River Watershed District
2013 Fiscal Year Funding Amount
$72,950
Fund Source

There are fifty-seven impaired water bodies in the Sauk River watershed. The goal of this project is to provide the necessary tools for the Sauk River Watershed District (SRWD) and local agencies to work together to target priority areas, install the necessary water quality restoration projects, and track what has been completed to achieve reduction goals for each impaired waterbody. First, technology will be utilized to determine where high priority runoff areas are within the Sauk River watershed. Advanced sub-watershed modeling will be refined to a smaller scale.

Stearns
Recipient
Stearns County
2022 Fiscal Year Funding Amount
$832,550
Fund Source

The Sauk River's CWMP identifies altered hydrology and excessive sediment & nutrients as the top priority resource concerns to be addressed. Goals for each priority resource concern are found on pages 4-6 and 4-21 of the CWMP. To achieve these goals, The CWMP contains multiple prioritization schemes, on both a watershed-wide and watershed management unit basis, to achieve these goals - refer to pages 4-8 through 4-11 and 4-22 through 4-31 of the CWMP.

Douglas
Meeker
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2018 Fiscal Year Funding Amount
$33,575
Fund Source

The Sauk River Watershed District (SRWD) shall conduct water quality sampling for the Sauk River and tributary sites, as well as several lakes, for Cycle 2 of the Intensive Watershed Monitoring (IWM) during 2018 and 2019. Field monitoring will be completed at 14 stream locations and 9 lakes designated by the Minnesota Pollution Control Agency.
Data management will also be completed by the SRWD, including entering and submitting all data to Canvas and compiling all photos, calibration logs and other documents as requested.

Stearns
Todd
Recipient
Tetra Tech
2020 Fiscal Year Funding Amount
$14,945
Fund Source

This work order will extend all of the timeseries in the Sauk River Watershed  Hydrological Simulation Program FORTRAN (HSPF) model through 2019. The Sauk River Watershed HSPF model simulates hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and chlorophyll a.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$61,540
Fund Source

This project will complete an assessment of watershed lakes and streams. The assessment will include biological and stressor id analysis, which will support a summary report on lake conditions and protection strategies for lakes included in this watershed study.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$435,289
Fund Source

The Sauk River Stormwater Runoff Reduction and Riparian Restoration Project is a watershed-wide effort to reduce the amount of nutrients delivered by stormwater and bank erosion to area surface waters. Funds will be used to assist local schools and municipalities with their restoration project design, installation, and financing.

Douglas
Pope
Stearns
Todd
Recipient
City of Sartell
2012 Fiscal Year Funding Amount
$500,000
Fund Source

Acquire approximately 44 acres along the Sauk River for a regional park to provide nature-based outdoor recreation including nature trails, canoe access, snow shoeing, and cross country skiing.

Stearns
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$41,783
Fund Source
The goal of this project is the development of a phosphorus TMDL for the eleven impaired lakes in the Sauk River Watershed.
Stearns
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$9,980
Fund Source
Develop a phosphorus TMDL for Eden and Vails Lakes in the Sauk River Watershed.
Stearns
Recipient
Stearns SWCD
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The Sauk River Chain of Lakes Community Partners Area has many lakes that are not meeting state water quality standards or are in jeopardy of not meeting standards and are in desperate need of runoff reduction strategies. The Stearns County Soil and Water Conservation District is eager to work with willing sponsors within the project area to educate, inform and expand the conservation culture to assist in siting and implementing water quality projects on the landscape.

Stearns
Recipient
Pheasants Forever, MLT, Sauk River WD
2020 Fiscal Year Funding Amount
$2,946,000
Fund Source

Through the Sauk River Watershed Habitat Protection and Restoration program, the Partnership protected 726 acres (264 acres through fee simple acquisition and 462 acres through conservation easements). Additionally, the program restored/enhanced 780 acres of high priority habitat in the Sauk River Watershed. Overall, we achieved 111% of our land protection goal, 177% of our R/E acreage goal, and 397% of our proposed leverage goal. Our actions increased habitat connectivity, biodiversity, and landscape resilience.

Douglas
Pope
Stearns
Recipient
Sauk River WD, MLT, GRG, PF
2025 Fiscal Year Funding Amount
$3,965,000
Fund Source

This program permanently protects, restores, and enhances critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land use conversion. Using conservation easements and fee land acquisition, we will protect approximately 387 acres of high priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area. We will restore/enhance approximately 107 acres of wetlands, stream corridors, and accompanying uplands, creating vital habitat for waterfowl, fishes, and populations of threatened and endangered species.

Stearns
Recipient
Stearns County
2024 Fiscal Year Funding Amount
$1,212,865
Fund Source

Per the CWMP (pgs. 3-5 through 3-6), the issues Altered Hydrology and Excessive Nutrients and Sediment are top priority issues/concerns to be addressed. During development of this work plan, the Implementation Team added the issue/concern High Water Quality Lakes as a secondary priority for this work plan (13 lakes - CWMP figure 4-9), noting it is closely related, often overlaps, there are multiple benefits to be gained, and there is strong local desire to protect these lakes.

Douglas
Pope
Stearns
Todd
Recipient
Sauk River WD; Pheasants Forever; MLT
2023 Fiscal Year Funding Amount
$4,091,000
Fund Source

This program permanently protects, restores, and enhances critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land use conversion. Using conservation easements and fee land acquisition, we will protect approximately 500 acres of high priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area. We will restore/enhance approximately 74 acres of wetlands and accompanying uplands, creating vital habitat for waterfowl and populations of Species in Greatest Conservation Need (SGCN).

Douglas
Pope
Stearns
Todd
Recipient
Lanesboro Arts Center
2013 Fiscal Year Funding Amount
$91,365
To sensitively rehabilitate Scanlan Hall, a contributing feature of the Lanesboro Historic District listed in the National Register of Historic Places, with Americans with Disabilities Act-compliant access to the Lanesboro Art Center
Fillmore
Recipient
Fillmore Central Public Schools
2020 Fiscal Year Funding Amount
$3,000

School Residency

Fillmore
Recipient
Kingsland Public Schools
2019 Fiscal Year Funding Amount
$2,500

School Residency

Fillmore
Mower