This contract is a component of larger project (Snake River E.coli Microbial Source Tracking Study – Cycle II) in the Snake River Watershed located in the St. Croix river basin. The study will address microbial water quality impairments in the watershed. This study will conduct fecal bacteria source tracking using genetic markers across impaired streams in the watershed during the spring and summer months of 2021.
The Minnesota Soil Survey is an ongoing effort by the Board of Water and Soil Resources (BWSR) in cooperation with the U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) that is systematically collecting and mapping data pertaining to soil types and other soil properties in each county of the state. Soils data is used by governments, farmers, and other businesses for a number of purposes from protection and restoration of soil, water, wetlands, and habitats to agricultural soil management to building construction.
The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.
to install two solar thermal flat plate collectors for existing shower facility that will produce shade for the adjacent picnic table and children's playground area
The Somali Museum of Minnesota will curate and present two new monthly series of public programs designed to amplify, celebrate, and preserve Somali culture. The first series will be gallery-based and draw from the museum’s collection to offer Somali language, cultural and history instruction targeted to Somali families and school age youth. The second series, designed for a broader audience, will present artist talks and demonstrations, dance performances, exhibitions, and poetry readings.
Conduct well survey, Develop wellhead protection information for newsletters, handouts and website; and contact tank property owners on placement and best management practices to prevent contamination of groundwater resources.
Installation of an automatic transfer switch and disconnect, generator wiring, generator concrete pad, electrical permit, commissioning, all wiring, LP gas connection equipment and other supporting equipment as necessary for a future generator connection.