Drill a new well
Upgrading storm sewer system.
Construct a new well.
Seal abandoned wells #1 and #2. (Phase 2)
Distribute a WHP newsletter to residents. Seal old wells and test wells. Install a security door on the water plant.
Drill new well, pump, and pressure tank to replace well #4 Osprey (827575).
Capping and sealing 2 non-conforming wells. (#267307 & #482936)
Purchase and installation of arsenic treatment system for well #1 (265454).
Relocate portion of the storm water system that penetrates the IWMZ.
Seal wells #1 and #2. (Phase 2)
Connect a residential home to city sewer.
Well integrity investigation of Well #263067
Deepening of Well #2 (839954) to increase water yield
Seal unused well
Well construction
Modification of a well. Install casing and grout.
Seal unused well.
Install treatment. Add filtration, tank and monitoring equipment.
Drill new well
Upgrade SCADA to ensure safety and security for wells
Install treatment for groundwater
Drill a new well and seal well No. 265966
Drill and install 4 above grade monitoring wells.
Abandon and seal 3 industrial wells
New well construction to replace a dug well.
Install protective fence barrier around wells.
Clear well so a borehole geophysical survey can be conducted on Well #2.
Certify wells as sealed and abandoned
Relocate utility pole
Potential contaminants database; Management of sites with documented environmental contamination; Public education
Development of stakeholders group and selection criteria, emergency preparedness planning review, review of water sources for surrounding cities,
Install two 2,500 gallon water tanks
Construct new well