The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
The Minnesota Soil Survey is an ongoing effort by the Board of Water and Soil Resources (BWSR) in cooperation with the U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) that is systematically collecting and mapping data pertaining to soil types and other soil properties in each county of the state. Soils data is used by governments, farmers, and other businesses for a number of purposes from protection and restoration of soil, water, wetlands, and habitats to agricultural soil management to building construction.
This project will augment data collection efforts for the Lake Superior South, Cloquet, St. Louis River, and Duluth Urban Watershed Restoration and Protection Strategy (WRAPS) projects. Activities include: attaining datasets for watershed stressors and geomorphic conditions, water quality gap monitoring, and civic engagement. The Minnesota Pollution Control Agency has been collaborating with the South St. Louis Soil and Water Conservation District (SWCD) to complete WRAPS related technical and civic engagement work in the Lake Superior basin for the past five years.
Improve security by purchasing and installing doors on city's well house, create and publish article on protecting source of water, potential contaminants, and wellhead program.
Drill well to clear pump for borehole geophysical survey on well 2. Purchase spill response materials to be better prepared in case of spill or train derailment.
Construct a well. Extend new overhead drop from existing power pole to pump house for 240 volt service. Extend new circuit from loadcenter to location of new pressure switch and well control box.
City and it's residents will evaluate the possible impacts of sewer, septic systems/absorption fields, and cesspools on the City's wells, review the data and develop a plan/ evaluate options and costs to manage or mitigate this contamination source.