Seven conservation easements were completed by this program resulting in the protection of 911 acres of high quality wildlife habitat and 28,181 feet (approximately 5.38 miles) of critical shoreline along priority lakes and rivers of northeast Minnesota. This project outcome exceeded by 211 acres that proposed for the grant. Total leverage through donated easements by landowners is estimated at $948,500, all in excess of proposed.
Through this grant, the Minnesota Land Trust protected 641 acres and 39,415 feet (7.46 miles) of critical shoreland and high-quality wildlife habitats in Minnesota’s Northeast region through permanent conservation easements. Landowners donated $2,100,500 in easement value through this grant, greatly leveraging by 131% the $1,609,000 in grant funding provided by the Outdoor Heritage Fund. The amount of shoreland protected exceeded that proposed for the grant by 299%.
Phase 5 of the Minnesota Land Trust's Critical Shoreland Habitat Program protected approximately 3.75 miles of shoreland and 417 acres of associated high-quality habitat in Minnesota's Northeast region by securing five permanent conservation easements in strategic locations along priority lakes and rivers. Conservation easements secured under this program are perpetual and will prevent fragmentation and destruction of existing habitat.
Through this grant, the Minnesota Land Trust protected approximately 8.25 miles of critical shoreland and 1,095 acres of high-quality fish and wildlife habitat in northeast Minnesota by securing four permanent conservation easements in strategic locations along priority lakes and rivers, exceeding our land protection goals by 332% and shoreland protection goals by 825%. Conservation easements secured under this program are perpetual and will prevent fragmentation and destruction of existing habitat.
The projects planned for the grant funds focus on essential updates and enhancements to our historic building, ensuring that we can continue to provide a safe, welcoming, and inclusive space for all who visit. The proposed improvements include upgrading our HVAC system, kitchen, and security infrastructure; rebuilding the handicap ramp for improved accessibility; sourcing new patio furniture; and resealing the venue's dance floor. Each of these initiatives is designed to maintain the integrity of our facility while enhancing the experience of our diverse audience.
to construct a 10 foot wide bituminous pedestrian trail, extending the Cross City Trail from 37th Avenue West to 24th Avenue West within the City of Duluth
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.
This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.
This project will allow for outreach programs to engage interested citizens in protecting 200 acres of riparian buffer in the headwaters of the watershed, accounting for 1860 tons of sediment prevented from reaching surface waters each year the practices remain in place. The desired outcome would include 30 or more participants in the program, and to develop a more extensive volunteer base.
This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.
Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.