Install treatment. Add filtration, tank and monitoring equipment.
Drill new well
Irrigate its clarified effluent from Lime storage pond #6 instead of discharging to Mississippi River
Install treatment for groundwater
Drill a new well and seal well No. 265966
Drill a new well
Drill and install 4 above grade monitoring wells.
Abandon and seal 3 industrial wells
New well construction to replace a dug well.
Clear well so a borehole geophysical survey can be conducted on Well #2.
Certify wells as sealed and abandoned
Well site study
Potential contaminants database; Management of sites with documented environmental contamination; Public education
Development of stakeholders group and selection criteria, emergency preparedness planning review, review of water sources for surrounding cities,
Install two 2,500 gallon water tanks
Construct new well
Seal 4 wells 581065, 603824; Install fence around RPSWD wells
Sonic drilling and sealing abandoned well #8 (269272)
Install security fence around City wells; Update website with information about wellhead protection
Install treatment - nitrate reduction system
Grout annular space of Well #8
Drill test wells to determine location of new well due to nitrate contamination
Construct a new well; Seal existing well 491104
Construct a new well
Seal annular space around well #4
Replace water softening system and add nitrate reduction system.
Locate potential abandoned municipal wells; Seal wells 269265, 269266
Install raw water piping from the new well field to the treatment plant
Update PCSI; Manage sites with documented environmental contamination; Seal unused well
Purchase and installation of electronic magnetic meter and static water level indicators
Find site and develop well for city residents. Drill two test wells, supply and install well screen for two test wells, and grout, log and sample two wells.
Expansion of file information related to two active leak sites
Nitrate treatment installation
Develop a groundwater flow model