Provide contract management to ENRTF pass-through appropriation recipients for approximately 115 open grants. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved work plans.
This proposal accelerates the strategic permanent protection of 1,003 acres (241 wetlands and 762 grasslands) of Waterfowl Production Areas (WPAs) open to public hunting in Minnesota. Pheasants Forever (PF) will strategically acquire parcels that are adjacent to existing public land or create corridors between complexes. All acquisitions will occur in the prairie, prairie/forest transition, or metro regions.
This proposal will accomplish shallow lake and wetland enhancement and restoration work throughout Minnesota, with a focus on the prairie region. Over 4,000 acres of wetland habitat will be impacted. The proposal is comprised of two components - (1) projects to engineer, construct and/or implement shallow lake and wetland enhancement activities, including cattail control, and (2) an expansion of the Wetland Management Program to increase its capacity to identify and implement needed management work for small wetlands in the prairie region.
This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
The Minnesota Land Trust proposes to permanently protect 550 acres of high quality habitat in southwest Minnesota by securing conservation easements within scientifically prioritized habitat complexes by filling key unmet gaps in the available land protection toolbox. Working with willing landowners the Land Trust will use its innovative bid model to maximize conservation benefit and financial leverage in project selection.
This Phase 2 partnership will accelerate USFWS wildlife habitat easements to restore and protect 775 acres of private grasslands and pothole wetlands in west-central Minnesota, and restore 50 additional prairie-wetland acres too. These "working land" conservation easements allow delayed haying and grazing while protecting restored wetlands and prairie grasslands for nesting ducks, pheasants, and other wildlife.
The program was to accelerate the protection of 1,230 acres of prairie grassland, wetland, and other wildlife habitat as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, we acquired 14 parcels for a total of 1,240.79 acres which exceeded our total acre goal of 1,230 acres by 10.79 acres. Breaking down acres by ecological section we acquired 160 acres in the forest/prairie and 1,080.79 acres in the prairie. We have a balance that will be returned to the Fund despite exceeding our acre goals.
Many of Minnesota's wetlands have been lost and the remainder degraded. The original proposal planned for 15,000 acres of wetland/shallow lake enhancement to provide critical habitat for each life stage of waterfowl and wetland wildlife. The six projects subsequently completed with this appropriation enhanced 13,800 acres of wetlands and shallow lakes in the Prarie and Forest/Prairie Ecosections of Minnestoa.
This program will complete the initial WMA site development on 1,500 acres of land acquired in the Accelerated Prairie Grassland WMA and Accelerated Wetland WMA Acquisition programs to meet standards for inclusion in the Outdoor Recreation System. This program will also accelerate the restoration, enhancement and management of at least 5,180 acres of native prairie vegetation on existing public lands.
This program will accelerate the improvement and protection of shallow lakes and large wetland habitat critical to migratory waterfowl and other wildlife in Minnesota by improving water quality and rejuvenating aquatic ecology in turbid shallow lake basins. DU will enhance eight (8) or more strategically-selected shallow lakes that have been legally designated by for wildlife management purposes by Minnesota DNR that total 6,000 wetland acres by engineering and implementing construction of water control structures, pumps, and fish barriers on their outlets.
This program will acquire and develop approximately 730, acres of new Wildlife Management Area (WMA) lands. New WMA acquisition acre targets by LSOHC Sections will be consistent with the recommendations of The Citizens Advisory Committee report of 2002? Wildlife Management Area Acquisition The Next 50 Years. Additionally, this program will protect 275 acres of native prairie as state Scientific & Natural Areas (SNAs) and perpetual Native Prairie Bank (NPB) easements.
This program will increase populations of a variety of game and non-game wildlife species by protecting and enhancing forest habitats on which wildlife depends. This program of on-the-ground forest conservation projects will amplify the wildlife value of forest communities on DNR administered forestlands. Our forest enhancement will treat 4,472 ac. These activities are not conducted as part of the DNR's commercial timber operations. Additionally, our program will acquire 404 acres of forestland that contributes to habitat complexes and other high priorities.
This program uses a multi-programmatic approach to achieve prioritized aquatic habitat protection, restoration, and enhancement for lakes, trout streams, and rivers across Minnesota. We propose to: i) protect 7.8 miles of shoreline on lakes, rivers and trout streams; ii) effect structural repairs to 2 lake outlet control structures that will integrate fish passage; iii) restore and enhance river and stream functions that will benefit over 50.5 river miles; and iv) enhance 1.4 miles of shoreline habitat on publicly-owned lakeshore.
The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457
This program accelerated the permanent protection of 1,001 acres of wetlands (185 acres) and grasslands (816 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 5 parcels for a total of 1,001 acres which exceeded our total acre goal of 935 acres by 66 acres. Breaking down acres by ecological section we exceeded our acre goal in the prairie area by 346 acres. We are also happy to bring in $3,794,200 of non-state match dollars to this effort, exceeding our match goal of $3,320,000 by $474,200. We h
This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program. Ten thousand acres of wetlands were enhanced by these activities.
Water control structures and dikes were designed and constructed on six Wildlife Management Areas (WMA) in the counties of Becker, Clearwater, Itasca, Lincoln, Roseau, and Yellow Medicine. Dike work at Roseau River WMA protects and enhances 3200 acres of wetlands wetlands in Pool 2 of the WMA. Roseau River WMA has 10 large water control structures, seven moist soil cells, and four large pools covering 11,800 acres. Cells for a moist soil unit were constructed at Lac Qui Parle WMA in Lac Qui Parle County.
Many of Minnesota's wetlands have been lost and the remainder degraded. Recent tiling and ditching have accelerated this situation. Through this program, shallow lakes and wetlands were designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents. Habitat accomplishments from this proposal have enhanced 19,365 acres of wetlands and shallow lakes to benefit waterfowl and wetland wildlife. Work was accomplish through constructed infrastructure, cattail control, and a significant prescribed wetland burn.
This phase of WMA acquisition protected 1802.55 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. With these 16 acquisition we have exceeded our planned acres of 1362 by more than 400 acres. Breaking down acres by ecological section we acquired 282 acres in the metro and 1520 acres in the prairie. We have a balance of $52,798 of grant funds and $81,837.48 in program income that will be returned despite exceeding our acre goals.
Reinvest In Minnesota (RIM) and Native Prairie Bank (NPB) coordinated to accelerate grassland protection efforts. Through this appropriation a total of 1,584 acres were protected. This included 604 RIM acres and 980 NPB acres. Easement acquisition focused on Minnesota Prairie Conservation Plan identified landscapes.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
The proposal was to accelerate the protection of 1,275 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. However, over the course of the appropriation, we acquired 10 parcels for a total of 1,498 acres which exceeded our total acre goal of 1,275 acres by 223 acres. Breaking down acres by ecological section we exceed our acre goal for the metropolitan area by 97 acres.
This program accelerated the permanent protection of 2,267 acres of wetlands (465 acres) and grasslands (1,802 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 18 parcels for a total of 2,267 acres which exceeded our total acre goal of 2,250 acres by 17 acres. Breaking down acres by ecological section we exceeded our acre goal for both the metropolitan area by 61 acres and in the prairie area by 346 acres. We have exceeded anticipated match of $5,125,000 by $771,500.