Construct a new well and feeder line to serve 12 units.
Install security cameras at the Richfield municipal wells
Drill new well. Seal existing well.
Well construction
Use landscape boulders to provide a protective barrier to the well.
Purchase and installation of pressure transducer fiber and electronic components
Public Outreach with tanks. Public Outreach with wells. Public Outreach with ISTS.
Seal 5-10 wells.
Hire engineer/consultant for a new well.
Provide educational materials about wells in Story Map. Provide educational materials to residents about potential contaminants. Utilize local organizationresources to improve public education to residents.
Prep work for installing back-up generator including pad, electrical wiring, and transfer switch.
Full replacement of security system infrastructure (cameras, switches, transmitters, connectivity, software)
Convert emergency power generator to a natural gas generator and have gas main extended approx. 300' to connect to the generator.
Seal unused wells.
Replace exterior door on the wellhouse.
Purchase and install generator (Phase 2)
Abandon 2 domestic water wells
Public education ; Tank survey
Install security cameras for the surveillance of wells #5 and #6 at the Water Treatment Plant #1 location
Update contaminant source inventory; public education
Stream bank restoration
Phase 2 Whitaker Project: slope protection at Whitaker Pond
Training programs for LPRW staff ; data collection devices; update PCSI
Connection to city water
Ed. materials for source owners and public ed.
Geological study to evaluate the source water aquifers in the area of the City of Rogers
Install cameras at well houses for wells 4, 5, 6
Identify and map contaminants; public education
Establish electronic newsletter to send to local government and general public
Investigate and prepare site for well sealing; Print and mail WHP brochure to properties within the DWSMA