Though many parts of the Twin Cities metropolitan area are urbanized, there are also has large areas of natural lands that continue to serve as important habitat for fish, wildlife, and plant communities. However, pressure on these remaining lands continues to intensify as population and development pressures increase.
This project is for the editing the draft Watershed Restoration and Protection Strategy and Total Maximum Daily Load Reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
This project is for the editing the draft Watershed Restoration and Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
The purpose of this project is to gather data specific to developing a site-specific standard for phosphorus for Upper and Lower Red Lakes. These are large shallow lakes that are located in an area where no shallow lake standard exists. Because of these lakes' unique characteristics, it is believed that a site-specific standard is more appropriate than the deep lake standards that currently exist. This project will include additional chemistry and flow monitoring of tributaries to the lakes, as well as outflow of Lower Red Lake to the Red Lake River.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The goal of this project is the completion of an Upper Mississippi River Bacteria Total Maximum Daily Load (TMDL) and Protection Plan. In addition, an Implementation Plan will be developed and finalized under this contract.
The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed.
The Cannon River is a designated Wild and Scenic River that originates in Rice County and joins the Mississippi River 120 miles downstream near Red Wing. The Upper Cannon, which encompasses 29% of the entire watershed, has been identified as a priority subwatershed.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
The goal of this project is to construct two executable Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the Minnesota River Headwaters and Lac qui Parle watersheds. The contractor will use the Minnesota River HSPF model application already developed by Tetra Tech as a starting point and will refine the model construction based on the details in this work plan. The contractor will produce HSPF models that, after calibration and validation, will readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
There has been a sharp decline in participation in outdoor recreation and education amongst youth, particularly in urban areas. Some argue that youth who have meaningful outdoor education experiences are more likely to become engaged in environmental stewardship and invested in outdoor resources as adults.
Establish and monitor 120 acres of intermediate wheatgrass (Kernza), a new perennial grain crop, in vulnerable wellhead protection regions of Minnesota to profitability reduce nitrate leaching to drinking water.
This project will collect up to one year of water quality and stream flow information on Kelle’s Coulee to aid in the development of the Valley Branch Watershed District Restoration and Protection study. The information being collected by the Washington Conservation District will be used in developing the models necessary to complete the TMDL for Kelle’s Coulee.
Partners: Carleton College and Veblen Farmstead. Preservation work at the Thorstein Veblen Farmstead National Historic Landmark, near Nerstrand, Rice County, Minnesota, will provide urgently needed stabilization and preservation of three outbuildings at the farmstead, including the original small barn, the large hay barn and the granary.The farmstead is a rare site that preserves and illustrates the pioneering immigrant experience on the prairie. People from across the country and from overseas have visited the property over the past several years.
Long Lake is a community asset for Vergas, enjoyed by residents and visitors alike. This project will construct a trail bordering Long Lake, maintaining public access and restoring the shoreline.
The VRWJPO is pursuing a Watershed Restoration and Protection Strategy (WRAPS) project in cooperation with the MPCA in order to better identify the sources of stress and impairment to the river, tributaries, and lakes and evaluate the feasibility of reaching water quality goals, and properly allocating pollution reduction goals to those areas identified as likely pollution sources. Successful restoration and protection outcomes are dependent on successful community building and ownership of both the problems and solutions identified in the WRAPS.
The goal is to develop the Watershed Restoration and Protection Strategy (WRAPS) and a public and stakeholder participation process that encourages local involvement in water quality discussions and solutions, identifying impaired waters, developing Total Maximum Daily Loads (TMDLs); and planning, setting priorities, and implementing the WRAPS recommendation to restore impaired waters. Phase II of the WRAPS will consists of developing TMDLs for the impaired reaches as well as developing the final WRAPS document and implementation planning.
The purpose of this project is to complete subwatershed analysis for Cannon River and Vermillion River sub-watersheds to prioritize and target Best Management Practices based on cost-effectiveness with regard to pollutant reduction. This process is intended to proactively assist local water management and partner agencies in maximizing the value of each dollar spent to improve water quality in the respective rivers.
To create and implement curricula that meets Minnesota Education Standards and enables more thorough student access to veteran's history.
The Carver County Historical Society proposed to develop educational programs that would more fully utilize the newly redesigned Veterans Gallery. The programs were developed through a two-stage process. The first stage, developed for this grant, was fact finding in cooperation with Carver County educators. The second stage, would be program development.
Veterans' Voices: Native Warriors will give Native American students in Minnesota the opportunity to hear memories and stories directly from Native American veterans from within their communities. Funds will also be used to create radio segments featuring the Native American veterans sharing their personal experiences in their own words. These segments will air statewide and be archived online giving all Minnesotans access now and in the future.
The objective of this project is to Plan and Execute a commemorative event for the 50th Anniversary of the Vietnam War and its Veterans.
Project Scope:
The scope of this project includes the planning, resourcing, staffing and executing the main event and 2-3 ancillary events which draw attention to Vietnam War Veterans. The project will focus on Minnesota Vietnam War Veterans (US and Allies).