The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.
To hire a qualified and experienced HVAC engineer to evaluate the current system in preparation for better control of the Northfield Historical Society museum environment.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
The Emerald Ash Borer (EAB) is an invasive insect that has been decimating ash trees throughout the Great Lakes states. It was first discovered in Minnesota in 2009 and is now found in four counties (Hennepin, Houston, Ramsey, and Winona). EAB poses a particularly serious threat to Minnesota because it is home to nearly 1 billion ash trees that occur throughout the state - the second most of any state.
Minnesota has 15.9 million acres of forest land managed by a variety of county, state and federal agencies, and private landowners for timber production, wildlife habitat, and ecological considerations. Forest managers rely on inventory data to make effective planning and management decisions. Because forests are continually changing through natural and human processes, forest inventory data is periodically updated. However, doing so is an expensive and time-consuming endeavor and, as a result, much of Minnesota’s forest inventory data is currently out of date.
The Emerald Ash Borer (EAB) is an invasive insect that has been decimating ash trees throughout the Great Lakes states. It was first discovered in Minnesota in 2009 and is now found in four counties (Hennepin, Houston, Ramsey, and Winona). EAB poses a particularly serious threat to Minnesota because it is home to nearly 1 billion ash trees that occur throughout the state - the second most of any state.
Partner Organizations: Northfield Historical Society, Rice County Historical Society, Carleton College, St. Olaf College, The Northfield Public Library, Northfield News, KYMN Radio, Northfield Arts Guild, Northfield Hospital, First National Bank of Northfield, St.
Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.
The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.
The University of Minnesota’s Landscape Arboretum is the largest and most diverse horticultural site in Minnesota. It features gardens and natural areas representative of Minnesota and the upper-Midwest that can be explored using several miles of trails. Additionally it conducts fruit and plant breeding research to develop cultivars that have particular desired characteristics, such as cold hardiness or disease resistance. The arboretum has a long-term goal of protecting the entire watershed of which it is a part.
The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.
This project will complete an inventory of drainage systems to prioritize locations for structural erosion control practices and buffer strips that will reduce sediment loading into Marsh Creek and Lower Wild Rice River downstream, which are both impaired by turbidity. An inspection plan and database will also be developed to enhance the county drainage ditch inspection program.