Well sealing. Pressure tanks and electrical components disconnected. Fill pressure tank pits with sand.
Seal well #1.
Update PCSI.
Phase 2 to seal well #1.
Installation of arsenic water filter system
Wire a generator
Evaluation of wells in well pit, Seal 4 wells within the DWSMA
Update PCSI wells/tanks inventory and public education
Seal four wells within the DWSMA
Investigate well integrity with camera, measure well casing and disinfection of well.
Complete electrical work and install concrete pad for generator.
Install arsenic removal system
Remove underground 10,000 gallon fuel oil tank to protect wells within the DWSMA
Drill test well, grout and chlorination and conduct pump test. Seal a well.
Complete a Feasibility Analysis for CR 75 Trunk Storm Sewer project to eliminate existing infiltration basin within the Emergency Response Zone
Work cooperatively with MDH to select an appropriate well site and perform test drilling and water quality monitoring.
Seal municipal well.
Secure a new water production source.
Purchase a generator for Well #5 (654758)
Install an arsenic treatment removal system according to MDH rules and regulations.
Seal unused well. Relocate and cover electrical conductor lines around the well.
Construct a new well. Seal well #817187.
Survey wells and finalize report. Develop materials and products to educate the public about groundwater protection.
Drill and test for water quality and capacity for a potential new water source.
Hydro clean and apply PE liner to inside of lift station.
Replace controls for the wells.
Rehab/Rebuild city well #1.
Test well drill and water quality sample.
Hydro clean and apply PE liner to inside of lift station. (Phase 2)
Seal well #3.
Seal 2 test wells. Research and document wells, tanks, and leak sites.
Purchase and install a generator for well #2. Phase 1
Assessment of utility ordinances. Completion of a Spill Response Plan. Purchase/install fencing around municipal wells.
Drill new well. Seal well.
Drill a secondary well.
Install a secondary well (Phase 2)
Seal wells; Inventory SSTS; Update website
Install two monitoring wells
Update drawdown equipment; Inspect private wells within the DWSMA