Hire electrician to properly setup wiring for the generator.
Conduct exploratory drilling and sampling for future public water supply well.
Work on existing well requirements. Drill new well if capacity is not met. Replacement of water lines.
Well sealing. Pressure tanks and electrical components disconnected. Fill pressure tank pits with sand.
Construct new well to replace well #1.
Seal well #1.
Inspect and evaluate existing well to determine cause of total coliform bacteria.
Update PCSI.
Phase 2 to seal well #1.
Installation of arsenic water filter system
Wire a generator
Evaluation of wells in well pit, Seal 4 wells within the DWSMA
Update PCSI wells/tanks inventory and public education
Investigate well integrity with camera, measure well casing and disinfection of well.
Seal well 694785
Reconstruct well to address groundwater under the direct influence of surface water
Complete electrical work and install concrete pad for generator.
Install arsenic removal system
Purchase generator. Send Well owners brochure.
Drill new well to replace surface water system and seal unused well
Drill a new well and seal well that can't be converted
Construct new well, seal two wells, unique well numbers 258480 and 258481
Drill 2 new wells. Seal 2 old wells.
Drill test well, grout and chlorination and conduct pump test. Seal a well.
Complete a Feasibility Analysis for CR 75 Trunk Storm Sewer project to eliminate existing infiltration basin within the Emergency Response Zone
Work cooperatively with MDH to select an appropriate well site and perform test drilling and water quality monitoring.
Seal municipal well.
Secure a new water production source.