Update PCSI wells/tanks inventory and public education
Investigate well integrity with camera, measure well casing and disinfection of well.
Seal well 694785
Complete electrical work and install concrete pad for generator.
Install arsenic removal system
Purchase generator. Send Well owners brochure.
Drill a new well and seal well that can't be converted
Construct new well, seal two wells, unique well numbers 258480 and 258481
Drill 2 new wells. Seal 2 old wells.
Drill test well, grout and chlorination and conduct pump test. Seal a well.
Complete a Feasibility Analysis for CR 75 Trunk Storm Sewer project to eliminate existing infiltration basin within the Emergency Response Zone
Work cooperatively with MDH to select an appropriate well site and perform test drilling and water quality monitoring.
Seal municipal well.
Secure a new water production source.
Purchase a generator for Well #5 (654758)
Install an arsenic treatment removal system according to MDH rules and regulations.
Seal unused well. Relocate and cover electrical conductor lines around the well.
Survey wells and finalize report. Develop materials and products to educate the public about groundwater protection.
Drill and test for water quality and capacity for a potential new water source.
Construct a new well.
Spill response planning. PCSI Update. Property owner mailing.
Rehab/Rebuild city well #1.
Test well drill and water quality sample.
Purchase and install generator. Includes automatic transfer switch, generator wiring, electrical permit, commissioning, all wiring, and natural gas connection equipment.
Seal well #3.
Purchase and installation of a generator. Including automatic transfer switch, wiring, concrete pad, electrical permit and other supporting equipment.
Seal 2 test wells. Research and document wells, tanks, and leak sites.
Purchase and install a generator for well #2. Phase 1
Assessment of utility ordinances. Completion of a Spill Response Plan. Purchase/install fencing around municipal wells.
Drill new well. Seal well.
Purchase and installation of a generator (Phase 2)
Installation of (Reduced Pressure Zone) RPZ valve to protect water source
Seal wells; Inventory SSTS; Update website
Install two monitoring wells
Update drawdown equipment; Inspect private wells within the DWSMA
Analyze drainage patterns; Stormwater infrastructure mapping throughout the DWSMA