Wiring for generator for Wells #6 (689606) and #7 (716432)
Video inspections to wells #1, #3, and #5.
Seal unused well #178992.
Purchase and install back-up generator.
Seal city well #3.
Conduct exploratory drilling and sampling for future public water supply well.
Well sealing. Pressure tanks and electrical components disconnected. Fill pressure tank pits with sand.
Seal well #1.
Update PCSI.
Phase 2 to seal well #1.
Installation of arsenic water filter system
Construct a new well
Wire a generator
Evaluation of wells in well pit, Seal 4 wells within the DWSMA
Update PCSI wells/tanks inventory and public education
Develop cost share irrigation incentive program for property owners for water efficiency.
Investigate well integrity with camera, measure well casing and disinfection of well.
Complete electrical work and install concrete pad for generator.
Install arsenic removal system
Install security fence and lockable gate around well house number 3
Drill test well, grout and chlorination and conduct pump test. Seal a well.
Complete a Feasibility Analysis for CR 75 Trunk Storm Sewer project to eliminate existing infiltration basin within the Emergency Response Zone
Work cooperatively with MDH to select an appropriate well site and perform test drilling and water quality monitoring.
Seal municipal well.
Secure a new water production source.
Purchase a generator for Well #5 (654758)
Install an arsenic treatment removal system according to MDH rules and regulations.