Construct an observation well into the Jordan Aquifer to evaluate and monitor sustainability of the City's water supply wells.
Remove and replace clay pipe sanitary sewer within 200' of an active municipal well.
Seal unused well. Relocate and cover electrical conductor lines around the well.
Survey wells and finalize report. Develop materials and products to educate the public about groundwater protection.
Drill and test for water quality and capacity for a potential new water source.
Rehab/Rebuild city well #1.
Seal well #2.
Test well drill and water quality sample.
Seal well #3.
Seal 2 test wells. Research and document wells, tanks, and leak sites.
Purchase and install a generator for well #2. Phase 1
Assessment of utility ordinances. Completion of a Spill Response Plan. Purchase/install fencing around municipal wells.
Drill new well. Seal well.
Place at least three 1 1/2 - 2 ft. diameter boulders as protective barriers around each of 2 wellheads.
Drill a secondary well.
Install a secondary well (Phase 2)
Seal wells; Inventory SSTS; Update website
Install two monitoring wells
Update drawdown equipment; Inspect private wells within the DWSMA
Seal three 4 inch diameter wells in DWSMA; Seal one 6 inch diameter well in the DWSMA (216322)
Analyze drainage patterns; Stormwater infrastructure mapping throughout the DWSMA
Connect to City of Faribault water system; Abandon existing well
Public education; identify abandoned wells
Installation of a 400 amp Transfer Switch
Verify contaminant source locations; update website
Seal well 1
Signage, test Spring Creek, emergency manual
Public education
PCSI wells/tanks and public ed.
Inventory leaking tanks and public education for tank owners
Develop a spill response plan; Educate property owners about management of potential contaminant sources
Purchase transducer to be installed on the new municipal well
Send information to property owners about storage tanks and class V wells; Update website with information on City's WHP plan and SWP program; Update PCSI
Seal unused well
Seal well; Replace septic system