All Projects

16161 Results for
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha