Seal test well 804938
Installation of automated monitoring equipment in the city wells.
Develop content and maps for GIS story map. WHPP evaluation. Distribute WM mailer.
Investigate well #2. Conduct feasibility study.
SEMWAL Water Analysis
Phase 1 to set-up for a generator.
Seal inactive city well #3. (Phase 1)
Phase 2 to purchase and install generator.
Seal abandoned well
Construct new well to replace well #1.
Inspect and evaluate existing well to determine cause of total coliform bacteria.
Drill new well
Seal 3 test wells.
Purchase of static level monitoring equipment
Purchase generator
Seal up to 10 private wells within the DWSMA
Update and validate the PCSI database
Seal well 272031
Well identification and update PCSI and GIS database
Reconstruct well to address groundwater under the direct influence of surface water
Construct a new well that is out of a flood plain to higher ground.
Purchase and connect a portable diesel generator as a back up for if power fails at Well #6
Purchase and install backup generator and equipment for well and reservoir
Drill new well to replace surface water system and seal unused well
Install permanent fencing around wells, water treatment plant, and the well house.
Seal two unused wells on private property within the DWSMA.
Purchase and install continuous water level monitor equipment to be installed in 2 observation wells.
Clean up well site and seal private well in DWSMA; Assist businesses and residences with water use reduction and provide educational information on water use and conservation on website.
Drill out wood and cement from well, video and then remove obstruction in well and seal well 272031.
Drill out wood and cement from well, video well and then remove obstruction in well and seal well 272031
Seal inactive city well #3. (Phase 2)
Seal inactive city well #3. (Phase 3)
Purchase and install 2 transducers for 2 wells.
Spill response planning. PCSI Update. Property owner mailing.